My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Petroleum Production Operations - Petroleum Engineering Previous Year Questions

Practice Petroleum Production Operations - Petroleum Engineering previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

11Papers
11Years
46Questions
1Topics

Petroleum Production Operations question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Petroleum Production Operations. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Easy 26 56.5%
Medium 20 43.5%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 21 45.7%
Numerical Answer Type (NAT) 19 41.3%
MSQ 6 13%

Subject weightage

Top subjects by unique question coverage.

Petroleum Engineering
46 Qs

Most asked topics

Top topics across the included previous year papers.

Petroleum Production Operations
46 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Production-system Analysis and Flow Assurance
20 Qs
Surface Processing, Storage and Transportation
10 Qs
Formation Damage, Stimulation and Artificial Lift
9 Qs
Completion, Servicing and Workover
7 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Petroleum Engineering (PE) 2026
5 Qs
Petroleum Engineering (PE) 2025
4 Qs
Petroleum Engineering (PE) 2024
3 Qs
Petroleum Engineering (PE) 2023
3 Qs
Petroleum Engineering (PE) 2022
2 Qs
Petroleum Engineering (PE) 2021
6 Qs
Petroleum Engineering (PE) 2020
3 Qs
Petroleum Engineering (PE) 2019
4 Qs
Petroleum Engineering (PE) 2018
5 Qs
Petroleum Engineering (PE) 2017
3 Qs
Petroleum Engineering (PE) 2016
8 Qs

Browse by subtopics

Open a focused page built from the same verified paper data.

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Petroleum Engineering (PE) 202620265View paper
Petroleum Engineering (PE) 202520254View paper
Petroleum Engineering (PE) 202420243View paper
Petroleum Engineering (PE) 202320233View paper
Petroleum Engineering (PE) 202220222View paper
Petroleum Engineering (PE) 202120216View paper
Petroleum Engineering (PE) 202020203View paper
Petroleum Engineering (PE) 201920194View paper
Petroleum Engineering (PE) 201820185View paper
Petroleum Engineering (PE) 201720173View paper
Petroleum Engineering (PE) 201620168View paper

Sample previous year questions

A varied preview from the papers represented in this selection, with every available option.

1
2016 · Petroleum Engineering · Petroleum Production Operations · Completion, Servicing and Workover
Petroleum Engineering (PE) 2016
A hydraulic line of a subsurface safety valve has a fluid of specific gravity 1.2 to operate the valve. The valve closing pressure is 1,200 psia and the recommended safety margin is 200 psia.
The maximum depth at which the valve can be positioned is __________ ft.
Open complete paper
2
2017 · Petroleum Engineering · Petroleum Production Operations · Production-system Analysis and Flow Assurance
Petroleum Engineering (PE) 2017
For a centrifugal pump, the head developed by the pump is proportional to the:
Open complete paper
3
2018 · Petroleum Engineering · Petroleum Production Operations · Production-system Analysis and Flow Assurance
Petroleum Engineering (PE) 2018

Pwf (bottom-hole well flowing pressure) vs. Q (flow rate) plots show the inflow performance relation (IPR) and vertical lift performance (VLP) curves. Figure I shows VLP curves for two well head pressures Pwh1 and Pwh2. Figure II shows VLP curves for two well diameters D1 and D2. Which one of the following statements is true?

Source question diagram

Source question diagram

Open complete paper
4
2019 · Petroleum Engineering · Petroleum Production Operations · Surface Processing, Storage and Transportation
Petroleum Engineering (PE) 2019

The process used for producing continuous insulation coating on an electrical wire is

Open complete paper
5
2020 · Petroleum Engineering · Petroleum Production Operations · Surface Processing, Storage and Transportation
Petroleum Engineering (PE) 2020

Which one of the following statements is NOT correct?

Open complete paper
6
2021 · Petroleum Engineering · Petroleum Production Operations · Production-system Analysis and Flow Assurance
Petroleum Engineering (PE) 2021

Solids that may possibly form in the offshore pipelines during the production of oil and gas from deep-water reservoirs are

Open complete paper