My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Petroleum Engineering Previous Year Questions

Practice Petroleum Engineering previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

4Papers
4Years
6Questions
2Topics

Petroleum Engineering question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Petroleum Engineering. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Easy 4 66.7%
Hard 2 33.3%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 5 83.3%
Numerical Answer Type (NAT) 1 16.7%

Subject weightage

Top subjects by unique question coverage.

Petroleum Engineering
6 Qs

Most asked topics

Top topics across the included previous year papers.

Engineering Mathematics
5 Qs
Oil and Gas Well Drilling Technology
1 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Calculus
4 Qs
Complex Variables
1 Qs
Well Planning, Rigs and Drilling Methods
1 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Petroleum Engineering (PE) 2024
1 Qs
Petroleum Engineering (PE) 2022
1 Qs
Petroleum Engineering (PE) 2019
3 Qs
Petroleum Engineering (PE) 2018
1 Qs

Browse by topics

Open a focused page built from the same verified paper data.

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Petroleum Engineering (PE) 202420241View paper
Petroleum Engineering (PE) 202220221View paper
Petroleum Engineering (PE) 201920193View paper
Petroleum Engineering (PE) 201820181View paper

Sample previous year questions

A varied preview from the papers represented in this selection, with every available option.

1
2018 · Petroleum Engineering · Engineering Mathematics · Complex Variables
Petroleum Engineering (PE) 2018
Two complex numbers, \(\tilde{k}\) and \(\tilde{\varepsilon}\) are related as follows: \[ \tilde{k} = \frac{\tilde{\varepsilon}}{i\omega} \] where, \(i = \sqrt{-1}\) and \(\omega\) is a scalar. Given principal argument of \(\tilde{\varepsilon}\), \(\text{Arg}(\tilde{\varepsilon}) = -\frac{2\pi}{3}\), the principal argument of \(\tilde{k}\), \(\text{Arg}(\tilde{k}) = \)__________. (rounded-off to two decimal places. Use \(\pi = 3.14\))
Open complete paper
2
2019 · Petroleum Engineering · Engineering Mathematics · Calculus
Petroleum Engineering (PE) 2019
A uniform cantilever beam \(ABC\) of length \(L\) is subjected to a point load \(P\) at point \(B\) and a concentrated moment \(M\) at point \(C\) (as shown in figure). Let \(E\) be the Young’s modulus of the beam material and \(I\) be the area moment of inertia of the beam’s cross-section. Assuming the validity of the Euler-Bernoulli theory of slender beams, the downward deflection at point \(C\) is
Open complete paper
3
2022 · Petroleum Engineering · Engineering Mathematics · Calculus
Petroleum Engineering (PE) 2022
Let \(\vec{F}(x,y) = e^y \sin x \, \hat{i} + x^2 \, \hat{j}\) for \((x,y) \in \mathbb{R}^2\). If \(C\) is the circle \(x^2 + y^2 = 4\) oriented in the anticlockwise direction then \(\oint_C \vec{F} \cdot d\vec{R}\) equals
Open complete paper
4
2024 · Petroleum Engineering · Engineering Mathematics · Calculus
Petroleum Engineering (PE) 2024
\(\mathbf{r}(t) = \frac{\sin 3t}{t}\mathbf{i} + (t+2)^t\mathbf{j} + (t+1)\frac{\sin t}{t}\mathbf{k}\), with \(i, j,\) and \(k\) being the unit vectors along \(x, y,\) and \(z\) directions, respectively.
The value of \(\lim_{t \to 0} \mathbf{r}(t)\) is __________.
Open complete paper
5
2019 · Petroleum Engineering · Engineering Mathematics · Calculus
Petroleum Engineering (PE) 2019
True centrifugal casting process in horizontal configuration is to be used for casting a metallic cylinder with outside diameter 0.275 m and inside diameter 0.250 m. If G-factor (ratio of centrifugal force experienced by the rotating cast metal to its weight) is 65 and acceleration due to gravity is 9.8 m/s², the minimum rotational speed (in rpm) required is closest to
Open complete paper
6
2019 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Well Planning, Rigs and Drilling Methods
Petroleum Engineering (PE) 2019

A 20 mm HSS drill with a point angle of 118° is used for drilling a through hole on a metallic plate of thickness 100 mm with a cutting speed of 333.33 mm/s and feed of 0.22 mm/rev. Assuming that the drill is touching the surface of the plate at the start, the drilling time (in s) is closest to

Open complete paper