My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Oil and Gas Well Drilling Technology - Petroleum Engineering Previous Year Questions

Practice Oil and Gas Well Drilling Technology - Petroleum Engineering previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

11Papers
11Years
68Questions
1Topics

Oil and Gas Well Drilling Technology question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Oil and Gas Well Drilling Technology. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Medium 35 51.5%
Easy 33 48.5%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

Numerical Answer Type (NAT) 35 51.5%
MCQ 26 38.2%
MSQ 7 10.3%

Subject weightage

Top subjects by unique question coverage.

Petroleum Engineering
68 Qs

Most asked topics

Top topics across the included previous year papers.

Oil and Gas Well Drilling Technology
68 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Drilling Fluids and Cementing
35 Qs
Drilling Problems and Well Control
11 Qs
Well Planning, Rigs and Drilling Methods
9 Qs
Bits, Drill Strings and Casing Design
7 Qs
Directional and Advanced Drilling
6 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Petroleum Engineering (PE) 2026
9 Qs
Petroleum Engineering (PE) 2025
9 Qs
Petroleum Engineering (PE) 2024
5 Qs
Petroleum Engineering (PE) 2023
5 Qs
Petroleum Engineering (PE) 2022
8 Qs
Petroleum Engineering (PE) 2021
3 Qs
Petroleum Engineering (PE) 2020
7 Qs
Petroleum Engineering (PE) 2019
7 Qs
Petroleum Engineering (PE) 2018
5 Qs
Petroleum Engineering (PE) 2017
3 Qs
Petroleum Engineering (PE) 2016
7 Qs

Browse by subtopics

Open a focused page built from the same verified paper data.

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Petroleum Engineering (PE) 202620269View paper
Petroleum Engineering (PE) 202520259View paper
Petroleum Engineering (PE) 202420245View paper
Petroleum Engineering (PE) 202320235View paper
Petroleum Engineering (PE) 202220228View paper
Petroleum Engineering (PE) 202120213View paper
Petroleum Engineering (PE) 202020207View paper
Petroleum Engineering (PE) 201920197View paper
Petroleum Engineering (PE) 201820185View paper
Petroleum Engineering (PE) 201720173View paper
Petroleum Engineering (PE) 201620167View paper

Sample previous year questions

A varied preview from the papers represented in this selection, with every available option.

1
2016 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Directional and Advanced Drilling
Petroleum Engineering (PE) 2016
For a kick off operation, a directional well has to be drilled for an arc-length of 2500 ft to achieve an inclination of 50°.
The radius of curvature will be ______ ft.
Open complete paper
2
2017 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Problems and Well Control
Petroleum Engineering (PE) 2017
A student has written following possible causes of lost circulation during a drilling operation.
i. High salinity in the reservoir
ii. Fracture in the reservoir
iii. A fault encountered during drilling
iv. Low viscosity of the reservoir fluid
Which of the above statements are correct?
Open complete paper
3
2018 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Fluids and Cementing
Petroleum Engineering (PE) 2018
Match the following chemicals to their respective oilfield applications:
(P) Hydrate inhibitor                                 (I) Formaldehyde
(Q) Well stimulation                             (II) Xanthan gum
(R) Drilling fluid biocide                        (III) Methanol
(S) Viscosifier                                     (IV) Hydrochloric acid
Open complete paper
4
2019 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Well Planning, Rigs and Drilling Methods
Petroleum Engineering (PE) 2019

The correct statement pertaining to the friction welding process is

Open complete paper
5
2020 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Fluids and Cementing
Petroleum Engineering (PE) 2020

Which one of the following additives is commonly added to drilling fluids to remove hydrogen sulfide?

Open complete paper
6
2021 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Fluids and Cementing
Petroleum Engineering (PE) 2021
Oil and gas pipelines, which are at an elevated pressure (about 3 MPa) and sub-ambient temperature (below 298 K), may get blocked by the formation of solid hydrates. One of the strategies adopted to inhibit the formation of hydrates is the injection of Thermodynamic Hydrate Inhibitors (THIs) into the reservoir fluid.
Identify all suitable chemicals that are commonly used as THIs.
Open complete paper