My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Drilling Problems and Well Control - Oil and Gas Well Drilling Technology - Petroleum Engineering Previous Year Questions

Practice Drilling Problems and Well Control - Oil and Gas Well Drilling Technology - Petroleum Engineering previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

9Papers
9Years
11Questions
1Topics

Drilling Problems and Well Control question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Drilling Problems and Well Control. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Easy 6 54.5%
Medium 5 45.5%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 5 45.5%
Numerical Answer Type (NAT) 4 36.4%
MSQ 2 18.2%

Subject weightage

Top subjects by unique question coverage.

Petroleum Engineering
11 Qs

Most asked topics

Top topics across the included previous year papers.

Oil and Gas Well Drilling Technology
11 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Drilling Problems and Well Control
11 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Petroleum Engineering (PE) 2026
1 Qs
Petroleum Engineering (PE) 2025
1 Qs
Petroleum Engineering (PE) 2023
1 Qs
Petroleum Engineering (PE) 2022
2 Qs
Petroleum Engineering (PE) 2021
1 Qs
Petroleum Engineering (PE) 2020
1 Qs
Petroleum Engineering (PE) 2018
1 Qs
Petroleum Engineering (PE) 2017
1 Qs
Petroleum Engineering (PE) 2016
2 Qs

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Petroleum Engineering (PE) 202620261View paper
Petroleum Engineering (PE) 202520251View paper
Petroleum Engineering (PE) 202320231View paper
Petroleum Engineering (PE) 202220222View paper
Petroleum Engineering (PE) 202120211View paper
Petroleum Engineering (PE) 202020201View paper
Petroleum Engineering (PE) 201820181View paper
Petroleum Engineering (PE) 201720171View paper
Petroleum Engineering (PE) 201620162View paper

All Drilling Problems and Well Control previous year questions

Practice every matching question in batches of 20, with every available option.

1
2016 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Problems and Well Control
Petroleum Engineering (PE) 2016

Which of the following is the MOST COMMON cause for a fishing job?

Open complete paper
2
2016 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Problems and Well Control
Petroleum Engineering (PE) 2016

Match the entries in Group 1 with those in Group 2

Group 1Group 2
P. Blow Out PreventerI. Horizontal well problem
Q. Diamond bitII. Reverse ballooning
R. Tubing elongationIII. Well control
S. EccentricityIV. Crown
V. Ballooning
Open complete paper
3
2017 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Problems and Well Control
Petroleum Engineering (PE) 2017
A student has written following possible causes of lost circulation during a drilling operation.
i. High salinity in the reservoir
ii. Fracture in the reservoir
iii. A fault encountered during drilling
iv. Low viscosity of the reservoir fluid
Which of the above statements are correct?
Open complete paper
4
2018 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Problems and Well Control
Petroleum Engineering (PE) 2018
Primary and secondary indicators of kick in a well where the indicators are:
1) flow rate increase,
2) gas, oil or water-cut muds,
3) pit volume increase,
4) flowing well with mud pump shut-off,
5) reduction in drill-pipe weight,
6) drilling break.

Which one of the following presents the correct combination?
Open complete paper
5
2020 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Problems and Well Control
Petroleum Engineering (PE) 2020
Q.No. 49 A gas reservoir has a permeability of 1.0 mD, which is to be fractured hydraulically to create a 600 m long and 0.30 cm wide fracture of 2×10⁵ mD permeability around the center of damage area. The fracture conductivity for the well (rounded off to two decimal places) is ______.
Open complete paper
6
2021 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Problems and Well Control
Petroleum Engineering (PE) 2021

During a drilling operation, kick occurs if

Open complete paper
7
2022 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Problems and Well Control
Petroleum Engineering (PE) 2022
The dynamic mud inflow rate and mud outflow rate profiles are shown in the following figure.

Identify the “Hole ballooning” and the “Lost circulation” phenomena.
Open complete paper
8
2022 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Problems and Well Control
Petroleum Engineering (PE) 2022
An oil well is drilled using an 8.5-inch drill bit at a penetration rate of 30 ft/hr. The rotary speed is 20 rpm and the weight on the bit is 3500 lb. The value of the d exponent for the drilled section is ________ (rounded off to two decimal places).
Open complete paper
9
2025 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Problems and Well Control
Petroleum Engineering (PE) 2025
The hydrostatic pressure gradient in a vertical well drilled in a relaxed depositional basin is 0.452 psi/ft. Assume that the gradient of effective horizontal stress with depth is constant in the drilling zone and has a value of \(9.96 \times 10^{-2}\) psi/ft. The casing shoe is at 4000 ft depth.
While drilling the bore hole below the casing shoe with 10 ppg mud, the maximum allowed standpipe pressure is ______ psi (rounded off to one decimal place).
(Note: 1 ppg mud is equivalent to 0.052 psi/ft.)
Open complete paper
10
2023 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Problems and Well Control
Petroleum Engineering (PE) 2023

Which of the following option(s) is/are indication(s) of a well kick?

Open complete paper
11
2026 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Drilling Problems and Well Control
Petroleum Engineering (PE) 2026
A matrix acidizing job is planned on a sandstone pay zone at a depth of 7000 ft without formation breakdown by keeping a safety margin of 250 psi with the help of a coil tubing unit. Consider the fracture gradient of 0.7 psi/ft, average specific gravity of the injection fluid as 1.065, and frictional pressure drop of 200 psi.
The maximum surface injection pressure (in psi) is __________. (Rounded off to one decimal place)
[Given: Hydrostatic gradient (psi/ft) = 0.433 × Specific Gravity]
Open complete paper