My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Directional and Advanced Drilling - Oil and Gas Well Drilling Technology - Petroleum Engineering Previous Year Questions

Practice Directional and Advanced Drilling - Oil and Gas Well Drilling Technology - Petroleum Engineering previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

5Papers
5Years
6Questions
1Topics

Directional and Advanced Drilling question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Directional and Advanced Drilling. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Medium 5 83.3%
Easy 1 16.7%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

Numerical Answer Type (NAT) 5 83.3%
MCQ 1 16.7%

Subject weightage

Top subjects by unique question coverage.

Petroleum Engineering
6 Qs

Most asked topics

Top topics across the included previous year papers.

Oil and Gas Well Drilling Technology
6 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Directional and Advanced Drilling
6 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Petroleum Engineering (PE) 2025
2 Qs
Petroleum Engineering (PE) 2022
1 Qs
Petroleum Engineering (PE) 2020
1 Qs
Petroleum Engineering (PE) 2017
1 Qs
Petroleum Engineering (PE) 2016
1 Qs

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Petroleum Engineering (PE) 202520252View paper
Petroleum Engineering (PE) 202220221View paper
Petroleum Engineering (PE) 202020201View paper
Petroleum Engineering (PE) 201720171View paper
Petroleum Engineering (PE) 201620161View paper

All Directional and Advanced Drilling previous year questions

Practice every matching question in batches of 20, with every available option.

1
2016 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Directional and Advanced Drilling
Petroleum Engineering (PE) 2016
For a kick off operation, a directional well has to be drilled for an arc-length of 2500 ft to achieve an inclination of 50°.
The radius of curvature will be ______ ft.
Open complete paper
2
2017 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Directional and Advanced Drilling
Petroleum Engineering (PE) 2017
In a directional well, the kick off point has a true vertical depth (TVD) of 1000 m and the end of buildup section has a TVD of 1200 m. The buildup section for directional drilling has a horizontal displacement of 200 m, after which the tangent section has inclination of 45°. A driller monitors the well from the surface location of the well and sees that the target has horizontal departure of 1000 m. The TVD of the deepest point of the well is ______ meters.
Open complete paper
3
2020 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Directional and Advanced Drilling
Petroleum Engineering (PE) 2020
It is desired to drill a deviated well with ‘build and hold type’ trajectory. The kick-off point is at a vertical depth of 1500 ft from the surface and the rate of build is 2°/100 ft. At a true vertical depth (TVD) of 7500 ft, the net horizontal departure to the target is 2500 ft. The total measured depth is ______ ft.
Open complete paper
4
2022 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Directional and Advanced Drilling
Petroleum Engineering (PE) 2022
The station survey data during the directional drilling at two locations are given below.
Survey locationDepth (m)Inclination (α) (degree)Azimuth (β) (degree)
A449914.8N19E
B453013.5N10E

Dogleg angle = cos-1[cosαA cosαB + sinαA sinαB cos(βA - βB)]
The calculated dogleg severity (dogleg angle per 100 m of drilled section) is ______ (rounded off to one decimal place).

Question diagram

Open complete paper
5
2025 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Directional and Advanced Drilling
Petroleum Engineering (PE) 2025
Four different multilateral well patterns (Forked, Branched, Dual opening and Splayed) are shown in the figure.
Which ONE of the following options correctly identifies the multilateral well patterns?
Open complete paper
6
2025 · Petroleum Engineering · Oil and Gas Well Drilling Technology · Directional and Advanced Drilling
Petroleum Engineering (PE) 2025
A horizontal well is planned with two radial sections to land the target at an angle of 90°. The total vertical depth (TVD) between the surface and the target is 8000 ft. The buildup rate is 6° per 100 ft in the first section and 9° per 100 ft in the second section. The total angle built by the second section is 30°.
The distance of the first kickoff point from the surface is ______ ft (rounded off to one decimal place).
Open complete paper