My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Completion, Servicing and Workover - Petroleum Production Operations - Petroleum Engineering Previous Year Questions

Practice Completion, Servicing and Workover - Petroleum Production Operations - Petroleum Engineering previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

5Papers
5Years
7Questions
1Topics

Completion, Servicing and Workover question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Completion, Servicing and Workover. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Easy 6 85.7%
Medium 1 14.3%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 4 57.1%
Numerical Answer Type (NAT) 2 28.6%
MSQ 1 14.3%

Subject weightage

Top subjects by unique question coverage.

Petroleum Engineering
7 Qs

Most asked topics

Top topics across the included previous year papers.

Petroleum Production Operations
7 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Completion, Servicing and Workover
7 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Petroleum Engineering (PE) 2026
1 Qs
Petroleum Engineering (PE) 2025
1 Qs
Petroleum Engineering (PE) 2022
2 Qs
Petroleum Engineering (PE) 2021
1 Qs
Petroleum Engineering (PE) 2016
2 Qs

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Petroleum Engineering (PE) 202620261View paper
Petroleum Engineering (PE) 202520251View paper
Petroleum Engineering (PE) 202220222View paper
Petroleum Engineering (PE) 202120211View paper
Petroleum Engineering (PE) 201620162View paper

All Completion, Servicing and Workover previous year questions

Practice every matching question in batches of 20, with every available option.

1
2016 · Petroleum Engineering · Petroleum Production Operations · Completion, Servicing and Workover
Petroleum Engineering (PE) 2016
A hydraulic line of a subsurface safety valve has a fluid of specific gravity 1.2 to operate the valve. The valve closing pressure is 1,200 psia and the recommended safety margin is 200 psia.
The maximum depth at which the valve can be positioned is __________ ft.
Open complete paper
2
2016 · Petroleum Engineering · Petroleum Production Operations · Completion, Servicing and Workover
Petroleum Engineering (PE) 2016
A sucker rod pump unit is designated by C-228D-200-74. Here, ‘D’ represents
Open complete paper
3
2021 · Petroleum Engineering · Petroleum Production Operations · Completion, Servicing and Workover
Petroleum Engineering (PE) 2021
Match the suitable artificial lift methods (GROUP I) to meet the requirements (GROUP II) given in the table.
GROUP IGROUP II
(P) Progressive cavity pump(I) To deliver high-water cut (95%) oil with high flow rate.
(Q) Electric submersible pump(II) To deliver a fluid with viscosity of 1000 cP.
(R) Sucker rod pump(III) To deliquify a gas-well with 5 bbl/day water.
(S) Gas lift(IV) To be used in a sandy oil well to produce 5000 bbl/day.
Open complete paper
4
2022 · Petroleum Engineering · Petroleum Production Operations · Completion, Servicing and Workover
Petroleum Engineering (PE) 2022

Which ONE of the following is used to support the packer against the casing while expanding the rubber sealing element?

Open complete paper
5
2022 · Petroleum Engineering · Petroleum Production Operations · Completion, Servicing and Workover
Petroleum Engineering (PE) 2022
Which of the following are NOT CORRECT during the operating cycle of a “sucker rod pump”?
Open complete paper
6
2025 · Petroleum Engineering · Petroleum Production Operations · Completion, Servicing and Workover
Petroleum Engineering (PE) 2025

The maximum Polished Rod Load (PRL) in the operation of the sucker rod pump is observed near the

Open complete paper
7
2026 · Petroleum Engineering · Petroleum Production Operations · Completion, Servicing and Workover
Petroleum Engineering (PE) 2026
A conventional Sucker Rod Pumping (SRP) unit is being used for lifting 25 °API oil from a depth of 5000 ft. The maximum and minimum values of polished rod loads are 14300 lbf and 5200 lbf, respectively.
The ideal counter balance load (in lbf) is __________. (Answer in integer)
Open complete paper