My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Offshore Structures, Ports and Harbours - Naval Architecture and Ocean Engineering - Naval Architecture & Marine Engineering Previous Year Questions

Practice Offshore Structures, Ports and Harbours - Naval Architecture and Ocean Engineering - Naval Architecture & Marine Engineering previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

3Papers
2Years
7Questions
1Topics

Offshore Structures, Ports and Harbours question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Offshore Structures, Ports and Harbours. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Medium 4 57.1%
Easy 2 28.6%
Hard 1 14.3%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MSQ 3 42.9%
MCQ 2 28.6%
Numerical Answer Type (NAT) 2 28.6%

Subject weightage

Top subjects by unique question coverage.

Naval Architecture & Marine Engineering
7 Qs

Most asked topics

Top topics across the included previous year papers.

Naval Architecture and Ocean Engineering
7 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Offshore Structures, Ports and Harbours
7 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Mining Engineering (MN) 2026
4 Qs
Naval Architecture and Marine Engineering (NM) 2026
1 Qs
Naval Architecture & Marine Engineering (NM) 2023
2 Qs

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Mining Engineering (MN) 202620264View paper
Naval Architecture and Marine Engineering (NM) 202620261View paper
Naval Architecture & Marine Engineering (NM) 202320232View paper

All Offshore Structures, Ports and Harbours previous year questions

Practice every matching question in batches of 20, with every available option.

1
2023 · Naval Architecture & Marine Engineering · Naval Architecture and Ocean Engineering · Offshore Structures, Ports and Harbours
Naval Architecture & Marine Engineering (NM) 2023

From the following, choose the offshore platform that can be used ONLY for offshore drilling purpose.

Open complete paper
2
2023 · Naval Architecture & Marine Engineering · Naval Architecture and Ocean Engineering · Offshore Structures, Ports and Harbours
Naval Architecture & Marine Engineering (NM) 2023
The layout of a Tension Leg Platform (TLP) is shown in the following figure. It consists of four interconnected pontoons at the bottom and four cylindrical columns, which support the working platform at the top. The density of sea water is 1025 kg/m³. Neglect the weight and buoyancy of the tethers. During operation, the maximum mass (in metric tonnes) of the entire structure must lie between
Open complete paper
3
2026 · Naval Architecture & Marine Engineering · Naval Architecture and Ocean Engineering · Offshore Structures, Ports and Harbours
Mining Engineering (MN) 2026
As per the UNFC mineral resources classification system, the highest category of resource is indicated by
Open complete paper
4
2026 · Naval Architecture & Marine Engineering · Naval Architecture and Ocean Engineering · Offshore Structures, Ports and Harbours
Mining Engineering (MN) 2026
A shovel needs to be selected from four models of different capacities, S1 to S4, for loading of dumpers. The operational data for the shovel-dumper combination are provided. The mean arrival rate of the dumpers at the loading point is 5 per hour and the waiting cost of dumper is ₹ 200 per hour. The inter-arrival time of dumpers and loading time of shovel follows exponential distribution. Ignoring the shovel hiring cost, the shovel type that will have minimum total cost (waiting and operating cost) is
ModelOperating cost of shovel (₹ per hour)Mean loading rate of shovel (number of dumpers per hour)
S18008
S28509
S392010
S4100011

Question source image

Open complete paper
5
2026 · Naval Architecture & Marine Engineering · Naval Architecture and Ocean Engineering · Offshore Structures, Ports and Harbours
Mining Engineering (MN) 2026
An economic block model along with extraction sequence is shown. The numbers given at the centre of the block represent the year of extraction, and that at the corners represent the block economic value in ₹ (lakhs). If the discount rate is 10%, the net present value (NPV), in lakhs, is ₹ __________. (rounded off to two decimal place)

Question source image

Open complete paper
6
2026 · Naval Architecture & Marine Engineering · Naval Architecture and Ocean Engineering · Offshore Structures, Ports and Harbours
Mining Engineering (MN) 2026
In a bench blasting, as shown, 49 kg of explosive is put in each hole. The detonation time of holes, in millisecond, and the associated scale distance (SD) vs. peak particle velocity (PPV) plot for the given blast pattern is shown. The PPV at a distance of 100 m, in mm s⁻¹, is ______. (rounded off to two decimal places)

Question source image

Open complete paper
7
2026 · Naval Architecture & Marine Engineering · Naval Architecture and Ocean Engineering · Offshore Structures, Ports and Harbours
Naval Architecture and Marine Engineering (NM) 2026

Which of the following structures is/are mainly used for harbor berthing?

Open complete paper