My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Watershed Management - Soil and Water Conservation Engineering - Agricultural Engineering Previous Year Questions

Practice Watershed Management - Soil and Water Conservation Engineering - Agricultural Engineering previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

8Papers
8Years
8Questions
1Topics

Watershed Management question pattern

Every graph below is calculated only from this selection.

Questions by year

Compare question counts across years.

Difficulty distribution

How the classified questions are distributed by difficulty.

Easy 4 50%
Medium 4 50%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 7 87.5%
Numerical Answer Type (NAT) 1 12.5%

Subject weightage

Top subjects by unique question coverage.

Agricultural Engineering
8 Qs

Most asked topics

Top topics across the included previous year papers.

Soil and Water Conservation Engineering
8 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Watershed Management
8 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Agricultural Engineering (AG) 2026
1 Qs
Agricultural Engineering (AG) 2024
1 Qs
Agricultural Engineering (AG) 2022
1 Qs
Agricultural Engineering (AG) 2016
1 Qs
Agricultural Engineering (AG) 2010
1 Qs
Agricultural Engineering (AG) 2009
1 Qs
Agricultural Engineering (AG) 2008
1 Qs
Agricultural Engineering (AG) 2007
1 Qs

Included previous year papers

Newest papers appear first. Search these papers or sort by year and name.

Paper nameYearPDFAttempt
Agricultural Engineering (AG) 20262026
1 questions in this view
2026
Agricultural Engineering (AG) 20242024
1 questions in this view
2024
Agricultural Engineering (AG) 20222022
1 questions in this view
2022
Agricultural Engineering (AG) 20162016
1 questions in this view
2016
Agricultural Engineering (AG) 20102010
1 questions in this view
2010
Agricultural Engineering (AG) 20092009
1 questions in this view
2009
Agricultural Engineering (AG) 20082008
1 questions in this view
2008
Agricultural Engineering (AG) 20072007
1 questions in this view
2007

All Watershed Management previous year questions

Practice every matching question in batches of 20, with every available option.

1
2007 · Agricultural Engineering · Soil and Water Conservation Engineering · Watershed Management
Agricultural Engineering (AG) 2007

Area of watershed is

Open complete paper
2
2008 · Agricultural Engineering · Soil and Water Conservation Engineering · Watershed Management
Agricultural Engineering (AG) 2008
The water spread length behind the bund is
Open complete paper
3
2009 · Agricultural Engineering · Soil and Water Conservation Engineering · Watershed Management
Agricultural Engineering (AG) 2009

The peak runoff volume from the catchment between two contour bunds constructed on a 2.5% slope is 972.5 m3. The contour bunds have top width of 500 mm, height 600 mm, side slope 2:1, vertical interval 1.0 m and length 250 m. If the crest of the overflow weir is at a height of 300 mm from the ground and time available for the excess water to flow through the weir is 20 minutes, discharge in m3 per minute through the weir is

Open complete paper
4
2010 · Agricultural Engineering · Soil and Water Conservation Engineering · Watershed Management
Agricultural Engineering (AG) 2010
A parabolic shaped grassed waterway has a top width of 4 m, a maximum depth of 0.40 m, and a slope of 2.5%. The Manning’s ‘n’ value is 0.035 and there is no provision of freeboard. The discharge carrying capacity of the waterway in m3 s-1 is
Open complete paper
5
2016 · Agricultural Engineering · Soil and Water Conservation Engineering · Watershed Management
Agricultural Engineering (AG) 2016

A watershed area of 1851 hectare has maximum distance of 7.12 km from the outlet to the farthest point on the divide line. The form factor of the watershed is

Open complete paper
6
2022 · Agricultural Engineering · Soil and Water Conservation Engineering · Watershed Management
Agricultural Engineering (AG) 2022
A parabolic shaped grass-waterway is to be designed to carry a flow of 2.85 m³ s⁻¹ down the slope of 3%. The permissible velocity of water in the waterway is 1.78 m s⁻¹. If the freeboard depth is excluded, the most appropriate top width in m and depth in m, respectively are
(Take Manning's roughness coefficient = 0.04)
Open complete paper
7
2024 · Agricultural Engineering · Soil and Water Conservation Engineering · Watershed Management
Agricultural Engineering (AG) 2024
The excess water from a watershed of area 16.95 km2 is drained out through a channel at an average rate of 2.8 m3.s-1. Drainage coefficient of the watershed, in cm, is __________. (Rounded off to 2 decimal places)
Open complete paper
8
2026 · Agricultural Engineering · Soil and Water Conservation Engineering · Watershed Management
Agricultural Engineering (AG) 2026
A natural colloidal clay, having the characteristics of absorbing water and swelling 8 to 15 times its dry size, used as an efficient and effective sealing material for farm ponds, is
Open complete paper