- Duration: 180 minutes
- Follow the instructions in the attached official question paper.
- This exam is inactive pending question setup and manual verification.
Civil Engineering (CE) 2013
Review the key details, then start the test when you are ready. You can also open the full package to see related papers.
Paper pattern & analysis
Filter this paper by subject, topic or subtopic. Every graph updates from the selected questions.
Topic distribution
Subtopic distribution
Difficulty distribution
Question type distribution
Instructions
Syllabus
Sample questions from this paper
Questions are selected across the paper subjects wherever the paper contains that variety.
– Q. 25carries one mark each.
There is no value of x that can simultaneously satisfy both the given equations.Therefore, find the
‘least squares error’ solution to the two equations, i.
What is the minimum number of multiplications involved in computing the matrix product PQR?
Matrixܲ has 4 rows and 2 columns, matrix ܳhas 2 rows and 4 columns, and matrixܴhas 4 rows and
1 column. __________
A 1-h rainfall of 10 cm magnitude at a station has a return period of 50 years. The probability that
a 1-h rainfall of magnitude 10 cm or more will occur in each oftwo successive years is:
Maximum possible value of Compacting Factor for fresh (green) concrete is:
As per IS 800:2007, the cross-section in which the extreme fiber can reach the yield stress, but
cannot develop the plastic moment of resistance due to failure by local buckling is classified as