ESE (IES) Electrical Engineering P2 2013

Review the key details, then start the test when you are ready. You can also open the full package to see related papers.

Questions 120
Duration 180 mins
Package ESE & GATE EE - Previous Year Papers

Paper pattern & analysis

Filter this paper by subject, topic or subtopic. Every graph updates from the selected questions.

Explore previous papers
Showing all 120 questions in this paper.

Subject distribution

No subject classification is available.

Topic distribution

No topic classification is available.

Subtopic distribution

No subtopic classification is available.

Difficulty distribution

Medium 90 75%
Hard 19 15.8%
Easy 11 9.2%

Question type distribution

Multiple Choices 120 100%

Instructions

Demo Instruction

Syllabus

Sample

Sample questions from this paper

Questions are selected across the paper subjects wherever the paper contains that variety.

1
2013 · Unclassified
ESE (IES) Electrical Engineering P2 2013
The advantage of hydro-electric power station over thermal power station is
A
the initial cost of hydro-electric power station is low
B
the operating cost of hydro-electric power station is low
C
hydro-electric power station can be constructed at the place where the energy is required
D
hydro-electric power station can supply the power throughout the year
2
2013 · Unclassified
ESE (IES) Electrical Engineering P2 2013
The incremental cost characteristics of two generators delivering 200 MW are as follows: For economic operation the generation P1 and P2 should be
A
100 MW and 100 MW
B
80 MW and 120 MW
C
200 MW and 100 MW
D
120 MW and 80 MW
3
2013 · Unclassified
ESE (IES) Electrical Engineering P2 2013
No load test was conducted on a three phase induction motor at different input voltages and the input power obtained was plotted against the input voltage. The intersection of the extrapolated curve on the Y-axis, would give
A
rated core loss
B
windage and friction loss
C
rated core loss and windage and friction loss
D
rated core loss and windage and friction loss
4
2013 · Unclassified
ESE (IES) Electrical Engineering P2 2013
A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity.
A
250 MW
B
1250 MW
C
1200 MW
D
750 MW
5
2013 · Unclassified
ESE (IES) Electrical Engineering P2 2013
In order to have lower cost of power generation
A
the load factor and diversity factor should be low
B
the load factor and diversity factor should be high
C
the load factor should be high but diversity factor should be low
D
the load factor should be low but diversity factor should be high
6
2013 · Unclassified
ESE (IES) Electrical Engineering P2 2013
Consider the following statements: The calculation performed using short line approximate model instead of nominal- model for a medium length transmission line delivering lagging load at a given receiving end voltage always results in higher: 1) Sending end current 2) Sending end power 3) Regulation 4) Efficiency Which of these statements are correct?
A
1 and 2 only
B
1, 3 and 4
C
1, and 4
D
1, 2 and 4