Difficulty distribution
How the classified questions are distributed by difficulty.
Your cart is empty.
Practice Casting - Manufacturing Processes I - Production & Industrial Engineering previous year questions organised from real papers, with year-wise coverage and clear topic navigation.
Every graph below is calculated only from this selection.
Year-wise coverage for Casting. Each bar uses a separate theme-derived color.
How the classified questions are distributed by difficulty.
MCQ, numerical, multiple-select and other formats found in these papers.
Top subjects by unique question coverage.
Top topics across the included previous year papers.
Top subtopics inside this exact selection.
Question coverage for the most populated papers. Every active PYP paper remains listed below.
Newest papers appear first. Sort by year, question coverage or name.
| Paper | Year / session | Questions in this view | Open |
|---|---|---|---|
| Production and Industrial Engineering (PI) 2026 | 2026 | 3 | View paper |
| Production & Industrial Engineering (PI) 2025 | 2025 | 3 | View paper |
| Production & Industrial Engineering (PI) 2024 | 2024 | 3 | View paper |
| Production & Industrial Engineering (PI) 2023 | 2023 | 2 | View paper |
| Production & Industrial Engineering (PI) 2022 | 2022 | 1 | View paper |
| Production & Industrial Engineering (PI) 2021 | 2021 | 2 | View paper |
| Production & Industrial Engineering (PI) 2020 | 2020 | 1 | View paper |
| Production & Industrial Engineering (PI) 2019 | 2019 | 1 | View paper |
| Production & Industrial Engineering (PI) 2018 | 2018 | 2 | View paper |
| Production & Industrial Engineering (PI) 2017 | 2017 | 2 | View paper |
| Production & Industrial Engineering (PI) 2016 | 2016 | 1 | View paper |
| Production & Industrial Engineering (PI) 2014 | 2014 | 3 | View paper |
| Production & Industrial Engineering (PI) 2013 [Session 1] | 2013 | 1 | View paper |
| Production & Industrial Engineering (PI) 2013 [Session 2] | 2013 | 2 | View paper |
| Production & Industrial Engineering (PI) 2013 [Session 4] | 2013 | 2 | View paper |
| Production & Industrial Engineering (PI) 2012 | 2012 | 1 | View paper |
| Production & Industrial Engineering (PI) 2011 | 2011 | 6 | View paper |
| Production & Industrial Engineering (PI) 2010 | 2010 | 4 | View paper |
| Production & Industrial Engineering (PI) 2009 | 2009 | 6 | View paper |
| Production & Industrial Engineering (PI) 2008 | 2008 | 5 | View paper |
| Production & Industrial Engineering (PI) 2007 | 2007 | 3 | View paper |
Practice every matching question in batches of 20, with every available option.
A cube shaped casting solidifies in 5 min. The solidification time in min for a cube of the same material, which is 8 times heavier than the original casting, will be
For a given volume of a riser, if the solidification time of the molten metal in riser needs to be quadrupled, the surface area of the riser should be made
Two cast iron blocks P and Q, each of 500 mm length, have the same cross-sectional area. Block P has rectangular cross-section of 100 mm × 200 mm. Block Q is of square cross-section. Both P and Q were cast under the same conditions with all their surfaces enclosed within the mould. The solidification time of a casting is proportional to the square of the ratio of its volume to its surface area. The ratio of solidification time of the block P to that of the block Q is ______.