Previous year question hub

Work System Design - Industrial Engineering - Production & Industrial Engineering Previous Year Questions

Practice Work System Design - Industrial Engineering - Production & Industrial Engineering previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

20Papers
18Years
57Questions
1Topics

Work System Design question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Work System Design. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Easy 38 66.7%
Medium 19 33.3%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 42 73.7%
Numerical Answer Type (NAT) 14 24.6%
MSQ 1 1.8%

Subject weightage

Top subjects by unique question coverage.

Production & Industrial Engineering
57 Qs

Most asked topics

Top topics across the included previous year papers.

Industrial Engineering
57 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Work System Design
57 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Production and Industrial Engineering (PI) 2026
2 Qs
Production & Industrial Engineering (PI) 2025
2 Qs
Production & Industrial Engineering (PI) 2024
3 Qs
Production & Industrial Engineering (PI) 2023
4 Qs
Production & Industrial Engineering (PI) 2022
2 Qs
Production & Industrial Engineering (PI) 2021
1 Qs
Production & Industrial Engineering (PI) 2020
1 Qs
Production & Industrial Engineering (PI) 2018
2 Qs
Production & Industrial Engineering (PI) 2017
2 Qs
Production & Industrial Engineering (PI) 2016
1 Qs
Production & Industrial Engineering (PI) 2014
2 Qs
Production & Industrial Engineering (PI) 2013 [Session 1]
4 Qs
Production & Industrial Engineering (PI) 2013 [Session 2]
4 Qs
Production & Industrial Engineering (PI) 2013 [Session 4]
4 Qs
Production & Industrial Engineering (PI) 2012
2 Qs
Production & Industrial Engineering (PI) 2011
4 Qs
Production & Industrial Engineering (PI) 2010
2 Qs
Production & Industrial Engineering (PI) 2009
6 Qs
Production & Industrial Engineering (PI) 2008
3 Qs
Production & Industrial Engineering (PI) 2007
6 Qs

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Production and Industrial Engineering (PI) 202620262View paper
Production & Industrial Engineering (PI) 202520252View paper
Production & Industrial Engineering (PI) 202420243View paper
Production & Industrial Engineering (PI) 202320234View paper
Production & Industrial Engineering (PI) 202220222View paper
Production & Industrial Engineering (PI) 202120211View paper
Production & Industrial Engineering (PI) 202020201View paper
Production & Industrial Engineering (PI) 201820182View paper
Production & Industrial Engineering (PI) 201720172View paper
Production & Industrial Engineering (PI) 201620161View paper
Production & Industrial Engineering (PI) 201420142View paper
Production & Industrial Engineering (PI) 2013 [Session 1]20134View paper
Production & Industrial Engineering (PI) 2013 [Session 2]20134View paper
Production & Industrial Engineering (PI) 2013 [Session 4]20134View paper
Production & Industrial Engineering (PI) 201220122View paper
Production & Industrial Engineering (PI) 201120114View paper
Production & Industrial Engineering (PI) 201020102View paper
Production & Industrial Engineering (PI) 200920096View paper
Production & Industrial Engineering (PI) 200820083View paper
Production & Industrial Engineering (PI) 200720076View paper

All Work System Design previous year questions

Practice every matching question in batches of 20, with every available option.

1
2007 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2007
Which one of the following is an effective therblig?
Open complete paper
2
2007 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2007
“Matching Exercise”. Choose the correct one out of the alternatives A, B, C, D
Open complete paper
3
2007 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2007
For the data given above, how many machines can be assigned to an operator to minimize idle time of the operator and machines?
ActivityTime (minutes)
machine loading + unloading2
machining4
walking from one machine to the next1
Open complete paper
4
2007 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2007
In a time study, the observed times and ratings for an elemental operation are as shown below:
Reading 1Reading 2
Rating (%)80100
Observed time (minutes)0.600.50

Considering an allowance of 10% of the normal time, the standard time (in minutes) for the operation is
Open complete paper
5
2008 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2008
Consider the following work sampling data: working time = 60%, average rating = 90%, relaxation allowance = 12.5%, actual output during the study = 1000 units and study duration = 480 minutes. The standard time per unit (in minutes) will be
Open complete paper
6
2008 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2008
An assembly line data is given below:
Station123456
Cycle time909090909090
Task time707080708060
Idle time202010201030
The percentage utilization of labour on the assembly line is
Open complete paper
7
2008 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2008
In mostly accepted and applicable PTS systems (i.e. MTM-2), the motions and their codes are specified. Match the following.
Group 1Group 2
P - Weight factors1. GW
Q - GET2. GA
R - PUT3. PB
S - Apply pressure4. A
Open complete paper
8
2009 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2009
A manufacturer has set up an assembly line where first, Task I is performed in Workstation 1 for 0.3 minutes; then Task II is performed in Workstation 2 for 0.4 minutes; and finally Task III is performed in Workstation 3 for 0.3 minutes. The efficiency (in %) of this assembly line setup is
Open complete paper
9
2009 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2009
Given:
Assertion [a] : Managers spend time on job analysis and job rating.
Reason [r] : Scientific management of wage structures through job evaluation helps increase productivity.
Open complete paper
10
2009 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2009
The following information relates to worker’s payment in a company:
Standard production of a worker = 12 jobs per hour
Standard job rate = Rs. 3.00 per job
Pay for production less than standard = 85% of standard job rate
Pay for production more than standard = 120% of standard job rate
Three workers produce at the rate of 11, 13 and 15 jobs per hour. The total pay for three workers per hour based on differential wage incentive scheme is
Open complete paper
11
2009 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2009
The following information relates to worker's payment in a company:
Standard production of a worker = 12 jobs per hour
Standard job rate = Rs. 3.00 per job
Pay for production less than standard = 85% of standard job rate
Pay for production more than standard = 120% of standard job rate
Three workers produce at the rate of 11, 13 and 15 jobs per hour. The total pay for three workers per hour based on differential wage incentive scheme is
Open complete paper
12
2010 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2010
An industrial process consists of the following six activities
1. Casting
2. Wait
3. To Buffing
4. Buffing
5. Inspection
6. Store
The correct flow process chart for this process is
Open complete paper
13
2011 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2011
A manufacturing cell has 5 machines A, B, C, D and E. The average cycle time (in minutes) for a job on each of the machines is given in the following table:
MachineABCDE
Average cycle time565.544.5

There are three operators in the cell. First operator operates machines A and B. The second operator operates machine C and the third operator operates machines D and E. All the jobs have to move in the following sequence:
A → B → C → D → E
Assuming the job transfer time between two machines to be negligible, the average cycle time (in minutes) for the manufacturing cell is
Open complete paper
14
2011 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2011
It is proposed to conduct a work sampling study of workers in a machine shop. Which of the following information would be necessary to determine the number of observations?
Open complete paper
15
2011 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2011
P, Q, R and S are four types of dangerous microbes recently found in a human habitat. The area of each circle with its diameter printed in brackets represents the growth of a single microbe surviving human immunity system within 24 hours of entering the body. The danger to human beings varies proportionately with the toxicity, potency and growth attributed to a microbe shown in the figure below:

[IMAGE]

A pharmaceutical company is contemplating the development of a vaccine against the most dangerous microbe. Which microbe should the company target in its first attempt?
Open complete paper
16
2012 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2012

A process needs to be standardized for method and time. Which one of the following represents the sequence of work study experiments?

Open complete paper
17
2012 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2012
The time for one cycle, in milliseconds, is
Open complete paper
18
2013 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2013 [Session 1]

Therbligs refer to the

Open complete paper
19
2013 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2013 [Session 1]

Match the CORRECT pairs.

Group IGroup II
P. Man-machine chart1. Determines standard time of jobs
Q. Learning curve2. Finds the preferred method of doing work
R. Time study3. Measures work improvement
S. Motion study4. Shows idle times
Open complete paper
20
2013 · Production & Industrial Engineering · Industrial Engineering · Work System Design
Production & Industrial Engineering (PI) 2013 [Session 1]
A firm produces 120 units of product in every 8 hour shift. Four operations as given below are needed to manufacture each unit of product.
OperationPrecedenceProcessing time (in min)
Pnone1
QP2
RP4
SQ, R3

The above operations are to be assigned to workstations, such that one or more operations are performed in each workstation. Only one unit of product will be processed in each workstation at a time. The minimum number of workstations that will achieve the production target, without violating the precedence constraints, is
Open complete paper

Showing 20 of 46 questions