My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Continuous Casting - Mineral Processing and Extractive Metallurgy - Metallurgical Engineering Previous Year Questions

Practice Continuous Casting - Mineral Processing and Extractive Metallurgy - Metallurgical Engineering previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

4Papers
4Years
4Questions
1Topics

Continuous Casting question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Continuous Casting. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Medium 2 50%
Easy 2 50%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 3 75%
MSQ 1 25%

Subject weightage

Top subjects by unique question coverage.

Metallurgical Engineering
4 Qs

Most asked topics

Top topics across the included previous year papers.

Mineral Processing and Extractive Metallurgy
4 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Continuous Casting
4 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Metallurgical Engineering (MT) 2022
1 Qs
Metallurgical Engineering (MT) 2021
1 Qs
Metallurgical Engineering (MT) 2010
1 Qs
Metallurgical Engineering (MT) 2009
1 Qs

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Metallurgical Engineering (MT) 202220221View paper
Metallurgical Engineering (MT) 202120211View paper
Metallurgical Engineering (MT) 201020101View paper
Metallurgical Engineering (MT) 200920091View paper

All Continuous Casting previous year questions

Practice every matching question in batches of 20, with every available option.

1
2009 · Metallurgical Engineering · Mineral Processing and Extractive Metallurgy · Continuous Casting
Metallurgical Engineering (MT) 2009
A 200 mm × 200 mm cross-section bloom is continuously cast at a casting speed of 0.05 m/s. The amount of heat extracted from the 0.7 m long mould is 1.28 MW. Assume that the temperature of the steel is at its melting point while entering and leaving the mould. Latent heat of fusion for the steel is 278 kJ/kg and density of steel is 7800 kg/m³. The thickness of the solidified shell emerging from the mould will be
Open complete paper
2
2010 · Metallurgical Engineering · Mineral Processing and Extractive Metallurgy · Continuous Casting
Metallurgical Engineering (MT) 2010

In continuous casting of steel, the mould is subjected to vertical oscillations in order to

Open complete paper
3
2021 · Metallurgical Engineering · Mineral Processing and Extractive Metallurgy · Continuous Casting
Metallurgical Engineering (MT) 2021

Match the terms (in Column I) with the unit process (in Column II)

Column IColumn II
(P) Submerged Entry Nozzle1. Ladle Furnace
(Q) Electric Heating2. Continuous Casting
(R) Raceway Zone3. LD Converter
(S) Oxygen Lancing4. Blast Furnace
Open complete paper
4
2022 · Metallurgical Engineering · Mineral Processing and Extractive Metallurgy · Continuous Casting
Metallurgical Engineering (MT) 2022
In continuous casting of steel, mould flux is used for ____________
Open complete paper