Difficulty distribution
How the classified questions are distributed by difficulty.
Your cart is empty.
Practice Work and Time - General Aptitude - General Aptitude (GA) previous year questions organised from real papers, with year-wise coverage and clear topic navigation.
Every graph below is calculated only from this selection.
Year-wise coverage for Work and Time. Each bar uses a separate theme-derived color.
How the classified questions are distributed by difficulty.
MCQ, numerical, multiple-select and other formats found in these papers.
Top subjects by unique question coverage.
Top topics across the included previous year papers.
Top subtopics inside this exact selection.
Question coverage for the most populated papers. Every active PYP paper remains listed below.
Newest papers appear first. Sort by year, question coverage or name.
| Paper | Year / session | Questions in this view | Open |
|---|---|---|---|
| Mechanical Engineering (ME) 2025 | 2025 | 1 | View paper |
| Mechanical Engineering (ME) 2020 [Session 2] | 2020 | 1 | View paper |
| Mechanical Engineering (ME) 2019 [Session 2] | 2019 | 1 | View paper |
| Mechanical Engineering (ME) 2018 [Session 1] | 2018 | 2 | View paper |
| Mechanical Engineering (ME) 2018 [Session 2] | 2018 | 1 | View paper |
| Mechanical Engineering (ME) 2016 [Session 1] | 2016 | 1 | View paper |
| Mechanical Engineering (ME) 2016 [Session 3] | 2016 | 1 | View paper |
| Mechanical Engineering (ME) 2015 [Session 1] | 2015 | 3 | View paper |
| Mechanical Engineering (ME) 2015 [Session 2] | 2015 | 2 | View paper |
| Mechanical Engineering (ME) 2014 [Session 3] | 2014 | 1 | View paper |
| Mechanical Engineering (ME) 2014 [Session 4] | 2014 | 1 | View paper |
| Mechanical Engineering (ME) 2012 | 2012 | 2 | View paper |
Practice every matching question in batches of 20, with every available option.
In a single pass drilling operation, a through hole of 15 mm diameter is to be drilled in a steel plate of 50 mm thickness. Drill spindle speed is 500 rpm, feed is 0.2 mm/rev and drill point angle is 118°. Assuming 2 mm clearance at approach and exit, the total drill time (in seconds) is
P, Q, R and S are working on a project. Q can finish the task in 25 days, working alone for 12 hours a day. R can finish the task in 50 days, working alone for 12 hours per day. Q worked 12 hours a day but took sick leave in the beginning for two days. R worked 18 hours a day on all days. What is the ratio of work done by Q and R after 7 days from the start of the project?
Seven machines take 7 minutes to make 7 identical toys. At the same rate, how many minutes would it take for 100 machines to make 100 toys?
From the time the front of a train enters a platform, it takes 25 seconds for the back of the train to leave the platform, while travelling at a constant speed of 54 km/h. At the same speed, it takes 14 seconds to pass a man running at 9 km/h in the same direction as the train. What is the length of the train and that of the platform in meters, respectively?
It was estimated that 52 men can complete a strip in a newly constructed highway connecting cities P and Q in 10 days. Due to an emergency, 12 men were sent to another project. How many number of days, more than the original estimate, will be required to complete the strip?
Two cars, P and Q, start from a point X in India at 10 AM. Car P travels North with a speed of 25 km/h and car Q travels East with a speed of 30 km/h. Car P travels continuously but car Q stops for some time after travelling for one hour. If both the cars are at the same distance from X at 11:30 AM, for how long (in minutes) did car Q stop?