My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Sewerage, Stormwater and Solid Waste Systems - Infrastructure, Services and Utilities - Architecture and Planning Previous Year Questions

Practice Sewerage, Stormwater and Solid Waste Systems - Infrastructure, Services and Utilities - Architecture and Planning previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

14Papers
14Years
22Questions
1Topics

Sewerage, Stormwater and Solid Waste Systems question pattern

Every graph below is calculated only from this selection.

Questions by year

Compare question counts across years.

Difficulty distribution

How the classified questions are distributed by difficulty.

Easy 18 81.8%
Medium 4 18.2%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 12 54.5%
Numerical Answer Type (NAT) 5 22.7%
MSQ 5 22.7%

Subject weightage

Top subjects by unique question coverage.

Architecture and Planning
22 Qs

Most asked topics

Top topics across the included previous year papers.

Infrastructure, Services and Utilities
22 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Sewerage, Stormwater and Solid Waste Systems
22 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Architecture and Planning (AR) 2026
1 Qs
Architecture and Planning (AR) 2025
2 Qs
Architecture and Planning (AR) 2024
3 Qs
Architecture and Planning (AR) 2023
2 Qs
Architecture and Planning (AR) 2022
1 Qs
Architecture and Planning (AR) 2021
2 Qs
Architecture and Planning (AR) 2020
1 Qs
Architecture and Planning (AR) 2019
1 Qs
Architecture and Planning (AR) 2017
2 Qs
Architecture and Planning (AR) 2016
1 Qs
Architecture and Planning (AR) 2013
2 Qs
Architecture and Planning (AR) 2009
1 Qs
Architecture and Planning (AR) 2008
2 Qs
Architecture and Planning (AR) 2007
1 Qs

Included previous year papers

Newest papers appear first. Search these papers or sort by year and name.

Paper nameYearPDFAttempt
Architecture and Planning (AR) 20262026
1 questions in this view
2026
Architecture and Planning (AR) 20252025
2 questions in this view
2025
Architecture and Planning (AR) 20242024
3 questions in this view
2024
Architecture and Planning (AR) 20232023
2 questions in this view
2023
Architecture and Planning (AR) 20222022
1 questions in this view
2022
Architecture and Planning (AR) 20212021
2 questions in this view
2021
Architecture and Planning (AR) 20202020
1 questions in this view
2020
Architecture and Planning (AR) 20192019
1 questions in this view
2019
Architecture and Planning (AR) 20172017
2 questions in this view
2017
Architecture and Planning (AR) 20162016
1 questions in this view
2016
Architecture and Planning (AR) 20132013
2 questions in this view
2013
Architecture and Planning (AR) 20092009
1 questions in this view
2009
Architecture and Planning (AR) 20082008
2 questions in this view
2008
Architecture and Planning (AR) 20072007
1 questions in this view
2007

All Sewerage, Stormwater and Solid Waste Systems previous year questions

Practice every matching question in batches of 20, with every available option.

1
2007 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2007

De-sludging interval (to the nearest year) is

Open complete paper
2
2008 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2008

The principle of Solid Waste Management involves

Open complete paper
3
2008 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2008

The ideal cross-section of a combined sewerage system for significant variation in flow is

Open complete paper
4
2009 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2009

The correct sequence of activities in Solid Waste Management is

Open complete paper
5
2013 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2013

PMGSY, a programme of Government of India, deals with

Open complete paper
6
2013 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2013

Physiochemical process of removing micro-organisms, colour and turbidity from sullage and sewage is known as

Open complete paper
7
2016 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2016
‘Segregation at source’ is a concept associated with
Open complete paper
8
2017 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2017

Which of the following processes is NOT adopted in solid waste management?

Open complete paper
9
2017 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2017

A drainage basin of 180 hectares comprises 40% wooded area, 45% grassed area and 15% paved area. Runoff coefficients for wooded, grassed and paved areas are 0.01, 0.2 and 0.95 respectively. The composite runoff coefficient for the drainage basin is __________

Open complete paper
10
2019 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2019

A sanitary landfill is provided with High Density Poly Ethylene (HDPE) lining along the ground surface. This is provided primarily to prevent

Open complete paper
11
2020 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2020
In a residential complex, the central play area is to be converted as a detention pond for storm water management. For a 24 hour rainfall event of 100 mm, 100% storm water of central play area and 70% storm water run-off from rest of the complex is to be held at the detention pond. Area distribution in the residential complex is given in the table.

TypeArea (m²)Run-off coefficient
Apartment Blocks12500.80
Central Play Area1500.60
Other Permeable Areas2000.70
Other Impermeable Areas4000.90

The required depth of the detention pond (in mm) is ________

Question diagram

Open complete paper
12
2022 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2022
A town with 0.45 million population sends its entire organic waste to a composting site on a daily basis through a truck of 15 ton carrying capacity. Assume total waste generated per capita per day is 0.21 kg and 40% of the total waste is organic waste. The minimum number of weekly round trips required by the truck (in integer) will be __________.
Open complete paper
13
2023 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2023
Select the parameter(s) required for determining peak rates of runoff using the Rational Formula.
Open complete paper
14
2023 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2023
Choose the correct statement(s) with regard to composting.
Open complete paper
15
2021 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2021

The two components for measuring time of concentration for storm water are

Open complete paper
16
2021 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2021

As per the Solid Waste Management Rules 2016, which among the following are ‘Duties of waste generators’?

Open complete paper
17
2024 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2024

Which of the following statements is correct for an oxidation pond to treat waste water?

Open complete paper
18
2024 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2024

Which of the following is/are component(s) of Right of Way (RoW) of a road?

Open complete paper
19
2024 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2024
A declining Industrial Town has proposed to improve water sustainability by reducing stormwater runoff through change of land use land cover (LULC), as shown in the Table below, to attract new residents.
LULCRunoff CoefficientExisting Area in hectareProposed Area in hectare
Industrial0.71500800
Residential0.510001200
Park and Playgrounds0.2512001000
Forest0.153001000

Considering a flat topography and zero additional runoff from the adjoining areas, the reduction in run-off generation for a 400 mm rainfall event in the industrial town for the proposed intervention, in cubic meters, is ______________ ×106 (rounded off to two decimal places).
Open complete paper
20
2025 · Architecture and Planning · Infrastructure, Services and Utilities · Sewerage, Stormwater and Solid Waste Systems
Architecture and Planning (AR) 2025
As per the Solid Waste Management Rules, 2016, co-processing is the use of ___________ and ___________ solid waste having calorific value exceeding 1500 kcal/kg as raw material or as a source of energy, or both.
Open complete paper

Showing 20 of 22 questions