My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Water Supply, Drainage and Waste Management - Building Services - Architecture and Planning Previous Year Questions

Practice Water Supply, Drainage and Waste Management - Building Services - Architecture and Planning previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

16Papers
16Years
39Questions
1Topics

Water Supply, Drainage and Waste Management question pattern

Every graph below is calculated only from this selection.

Questions by year

Compare question counts across years.

Difficulty distribution

How the classified questions are distributed by difficulty.

Easy 29 74.4%
Medium 10 25.6%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 21 53.8%
Numerical Answer Type (NAT) 12 30.8%
MSQ 6 15.4%

Subject weightage

Top subjects by unique question coverage.

Architecture and Planning
39 Qs

Most asked topics

Top topics across the included previous year papers.

Building Services
39 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Water Supply, Drainage and Waste Management
39 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Architecture and Planning (AR) 2025
4 Qs
Architecture and Planning (AR) 2024
2 Qs
Architecture and Planning (AR) 2023
5 Qs
Architecture and Planning (AR) 2022
2 Qs
Architecture and Planning (AR) 2021
4 Qs
Architecture and Planning (AR) 2020
1 Qs
Architecture and Planning (AR) 2019
1 Qs
Architecture and Planning (AR) 2018
2 Qs
Architecture and Planning (AR) 2017
1 Qs
Architecture and Planning (AR) 2016
2 Qs
Architecture and Planning (AR) 2014
4 Qs
Architecture and Planning (AR) 2013
1 Qs
Architecture and Planning (AR) 2011
1 Qs
Architecture and Planning (AR) 2010
2 Qs
Architecture and Planning (AR) 2009
3 Qs
Architecture and Planning (AR) 2007
4 Qs

Included previous year papers

Newest papers appear first. Search these papers or sort by year and name.

Paper nameYearPDFAttempt
Architecture and Planning (AR) 20252025
4 questions in this view
2025
Architecture and Planning (AR) 20242024
2 questions in this view
2024
Architecture and Planning (AR) 20232023
5 questions in this view
2023
Architecture and Planning (AR) 20222022
2 questions in this view
2022
Architecture and Planning (AR) 20212021
4 questions in this view
2021
Architecture and Planning (AR) 20202020
1 questions in this view
2020
Architecture and Planning (AR) 20192019
1 questions in this view
2019
Architecture and Planning (AR) 20182018
2 questions in this view
2018
Architecture and Planning (AR) 20172017
1 questions in this view
2017
Architecture and Planning (AR) 20162016
2 questions in this view
2016
Architecture and Planning (AR) 20142014
4 questions in this view
2014
Architecture and Planning (AR) 20132013
1 questions in this view
2013
Architecture and Planning (AR) 20112011
1 questions in this view
2011
Architecture and Planning (AR) 20102010
2 questions in this view
2010
Architecture and Planning (AR) 20092009
3 questions in this view
2009
Architecture and Planning (AR) 20072007
4 questions in this view
2007

All Water Supply, Drainage and Waste Management previous year questions

Practice every matching question in batches of 20, with every available option.

1
2007 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2007
Hazen’s-William’s nomogram is used to calculate
Open complete paper
2
2007 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2007

The correct sequence of various components of a house water connection from the municipal water main is

Open complete paper
3
2007 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2007
A typical roof top Rainwater Harvesting System essentially comprises of
P. Roof catchment
Q. Down pipes
R. Rain gauge
S. Filter chamber
Open complete paper
4
2007 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2007
Total capacity of septic tank in cubic metres is
Open complete paper
5
2009 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2009

The sudden stoppage in the flow of water in a closed conduit results in a phenomenon called

Open complete paper
6
2009 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2009
Identify the parameters used in the Hazen & William's nomogram to calculate pipe diameter for water supply:
P. Flow rate in lit/sec
Q. Pipe diameter in mm
R. Population to be served
S. Head loss in m/m
T. Velocity in m/sec
Open complete paper
7
2009 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2009

A building has a rooftop area of 300 sq.m. If the average annual rainfall in the region is 700 mm and the Runoff Coefficient of the rooftop is 0.8, then the maximum amount of rainfall that can be harvested from the rooftop (in litres) is

Open complete paper
8
2010 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2010
In water supply systems, the ‘Reflux Valves’ allow water to flow
Open complete paper
9
2010 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2010

The volume of water (in cubic metre) required for the reservoir is

Open complete paper
10
2011 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2011

If it rains for 30 min. with an intensity of 10 cm/hr, minimum volume of rain water that can be collected will be

Open complete paper
11
2013 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2013

The term ‘Working head’ in context of water supply system means

Open complete paper
12
2014 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2014

In a single-stack system of plumbing

Open complete paper
13
2014 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2014
A house located in Delhi has 111 m² of flat terrace area (runoff coefficient = 0.85) and 55 m² of ground area covered with grass (runoff coefficient = 0.15). If annual average rainfall is 611.8 mm, then rain water harvesting potential (L/year) from runoff will be ______
Open complete paper
14
2014 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2014
At a site, based on percolation test, the allowable rate of treated sewage application was determined as 65 L/m²/day. The effective depth (m) of a soak pit with a diameter of 2.5 m for the disposal of 1020 L/day of septic tank effluent is ______
Open complete paper
15
2014 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2014
A refuse collection system consisting of two chutes is to be provided in a 20 storied residential building with 2 flats/floor (average family size = 5) and with each chute serving one flat on each floor. Average quantity of refuse and its density are 880 g/person/day and 240 kg/m³ respectively. If the cleaning interval is two days, then the minimum size of the refuse container (litre) at the bottom of each chute is ______
Open complete paper
16
2016 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2016
Associate the systems in Group-I with their applications in Group-II
Open complete paper
17
2016 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2016
A pump is installed in an apartment building to lift water from ground level to the roof top water tank with the capacity of 10,000 litres. Total head of lift is 18 m and pumping time is 30 minutes to fill the tank completely. Assuming acceleration due to gravity (g) as 10 m/sec2 and efficiency of the pump as 80 percent, the power requirement of the pump in kW will be ____________________
Open complete paper
18
2017 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2017
In a multi-storied building, the type of plumbing system suitable for reusing the sullage for non-potable use is
Open complete paper
19
2018 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2018
A building with 100 sqm roof area is connected to a 72 cum rainwater collection tank. If the rainfall is 60 mm per hour and the loss during water storage is 20%, then the time taken to fill the tank completely is __________ hours.
Open complete paper
20
2018 · Architecture and Planning · Building Services · Water Supply, Drainage and Waste Management
Architecture and Planning (AR) 2018
The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd. Assuming 80% of the total use is met with recycled water supply, the daily domestic demand for the building is _________ litres.
Open complete paper

Showing 20 of 39 questions