Construction Management - Construction Materials and Management - Civil Engineering Previous Year Questions

Practice Construction Management - Construction Materials and Management - Civil Engineering previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

15Papers
11Years
30Questions
1Topics

Construction Management question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Construction Management. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Easy 19 63.3%
Medium 9 30%
Hard 2 6.7%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 23 76.7%
Numerical Answer Type (NAT) 6 20%
MSQ 1 3.3%

Subject weightage

Top subjects by unique question coverage.

Civil Engineering
30 Qs

Most asked topics

Top topics across the included previous year papers.

Construction Materials and Management
30 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Construction Management
30 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Civil Engineering (CE) 2025 [Session 2]
2 Qs
Civil Engineering (CE) 2025 [Session 1]
1 Qs
Civil Engineering (CE) 2024 [Session 2]
4 Qs
Civil Engineering (CE) 2024 [Session 1]
2 Qs
Civil Engineering (CE) 2022 [Session 2]
1 Qs
Civil Engineering (CE) 2017 [Session 2]
3 Qs
Civil Engineering (CE) 2016 [Session 2]
2 Qs
Civil Engineering (CE) 2016 [Session 1]
1 Qs
Civil Engineering (CE) 2014 [Session 1]
1 Qs
Civil Engineering (CE) 2014 [Session 2]
1 Qs
Civil Engineering (CE) 2013
1 Qs
Civil Engineering (CE) 2012
4 Qs
Civil Engineering (CE) 2011
2 Qs
Civil Engineering (CE) 2010
4 Qs
Civil Engineering (CE) 2009
1 Qs

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Civil Engineering (CE) 2025 [Session 1]20251View paper
Civil Engineering (CE) 2025 [Session 2]20252View paper
Civil Engineering (CE) 2024 [Session 1]20242View paper
Civil Engineering (CE) 2024 [Session 2]20244View paper
Civil Engineering (CE) 2022 [Session 2]20221View paper
Civil Engineering (CE) 2017 [Session 2]20173View paper
Civil Engineering (CE) 2016 [Session 1]20161View paper
Civil Engineering (CE) 2016 [Session 2]20162View paper
Civil Engineering (CE) 2014 [Session 1]20141View paper
Civil Engineering (CE) 2014 [Session 2]20141View paper
Civil Engineering (CE) 201320131View paper
Civil Engineering (CE) 201220124View paper
Civil Engineering (CE) 201120112View paper
Civil Engineering (CE) 201020104View paper
Civil Engineering (CE) 200920091View paper

All Construction Management previous year questions

Practice every matching question in batches of 20, with every available option.

1
2014 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2014 [Session 1]
A foundry has a fixed daily cost of Rs 50,000 whenever it operates and a variable cost of Rs 800Q, where Q is the daily production in tonnes. What is the cost of production in Rs per tonne for a daily production of 100 tonnes?
Open complete paper
2
2014 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2014 [Session 2]
Group I lists a few devices while Group II provides information about their uses. Match the devices with their corresponding use.
Open complete paper
3
2016 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2016 [Session 1]
The Optimistic Time (O), Most Likely Time (M) and Pessimistic Time (P) (in days) of the activities in the critical path are given below in the format O-M-P.

The expected completion time (in days) of the project is ________
Open complete paper
4
2016 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2016 [Session 2]
The activity-on-arrow network of activities for a construction project is shown in the figure. The durations (expressed in days) of the activities are mentioned below the arrows.

The critical duration for this construction project is
Open complete paper
5
2016 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2016 [Session 2]
A construction project consists of twelve activities. The estimated duration (in days) required to complete each of the activities along with the corresponding network diagram is shown below.

Total floats (in days) for the activities 5-7 and 11-12 for the project are, respectively,

Question diagram

Open complete paper
6
2017 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2017 [Session 2]
Given that the scope of the construction work is well-defined with all its drawings, specifications, quantities and estimates, which one of the following types of contract would be most preferred?
Open complete paper
7
2017 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2017 [Session 2]
For a construction project, the mean and standard deviation of the completion time are 200 days and 6.1 days, respectively. Assume normal distribution and use the value of standard normal deviate \( z = 1.64 \) for the 95% confidence level. The maximum time required (in days) for the completion of the project would be ________
Open complete paper
8
2017 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2017 [Session 2]
Consider the following statements:
P. Walls of one brick thick are measured in square meters.
Q. Walls of one brick thick are measured in cubic meters.
R. No deduction in the brickwork quantity is made for openings in walls up to 0.1 m² area.
S. For the measurement of excavation from the borrow pit in a fairly uniform ground, deadmen are left at suitable intervals.
For the above statements, the correct option is
Open complete paper
9
2022 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2022 [Session 2]
The activities of a project are given in the following table along with their durations and dependency.
ActivitiesDuration (days)Depends on
A10-
B12-
C5A
D14B
E10B, C
The total float of the activity E (in days) is ______. (in integer)
Open complete paper
10
2024 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2024 [Session 1]

Consider the statements P and Q.

P: Client’s Preliminary Estimate is used for budgeting costs toward the end of planning and design phase.

Q: Client’s Detailed Estimate is used for controlling costs during the execution of the project.

Which one of the following options is CORRECT?

Open complete paper
11
2024 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2024 [Session 1]
The initial cost of an equipment is Rs. 1,00,000. Its salvage value at the end of accounting life of 5 years is Rs. 10,000. The difference in depreciation (in Rs.) computed using ‘double-declining balance method’ and ‘straight line method’ of depreciation in Year-2 is __________ (in positive integer).
Open complete paper
12
2024 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2024 [Session 2]
Consider the statements P and Q:
P: In a Pure project organization, the project manager maintains complete authority and has maximum control over the project.
Q: A Matrix organization structure facilitates quick response to changes, conflicts, and project needs.
Which one of the following options is CORRECT?
Open complete paper
13
2024 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2024 [Session 2]
Consider the following data for a project of 300 days duration.
Budgeted Cost of Work Scheduled (BCWS) = Rs. 200
Budgeted Cost of Work Performed (BCWP) = Rs. 150
Actual Cost of Work Performed (ACWP) = Rs. 190
The 'schedule variance' for the project is
Open complete paper
14
2024 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2024 [Session 2]

A critical activity in a project is estimated to take 15 days to complete at a cost of Rs. 30,000. The activity can be expedited to complete in 12 days by spending a total amount of Rs. 54,000. Consider the statements P and Q.

P: It is economically advisable to complete the activity early by crashing, if the indirect cost of the project is Rs. 8,500 per day.

Q: It is economically advisable to complete the activity early by crashing, if the indirect cost of the project is Rs. 10,000 per day.

Which one of the following options is CORRECT?

Open complete paper
15
2024 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2024 [Session 2]
The table shows the activities and their durations and dependencies in a project.
ActivityDuration (Days)Depends on
A8-
B4A
C4B
D4C, L
F4A
G4F
H6G, L
K10A
L6F, K

The total duration (in days) of the project is __________
(in integer).
Open complete paper
16
2025 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2025 [Session 1]

In the context of construction project management, which of the following statements is/are true:

Open complete paper
17
2025 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2025 [Session 2]
Match the following in Column I with Column II.
Open complete paper
18
2025 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2025 [Session 2]
The figure shows a network diagram for a construction project. The activities A, B, C, D, E, and F are represented by arrows and their durations are in the figure.
The total float available for the activity E in day(s) is equal to ______ (round off to the nearest integer).

Question diagram

Open complete paper
19
2009 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2009
The correct match of Column I with Column II is
Open complete paper
20
2010 · Civil Engineering · Construction Materials and Management · Construction Management
Civil Engineering (CE) 2010
Group-I gives a list of devices and Group-II gives the list of uses. The correct match of Group-I with Group-II is
Open complete paper