My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Work and Time - General Aptitude - General Aptitude (GA) Previous Year Questions

Practice Work and Time - General Aptitude - General Aptitude (GA) previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

2Papers
2Years
2Questions
1Topics

Work and Time question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Work and Time. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Medium 2 100%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 2 100%

Subject weightage

Top subjects by unique question coverage.

General Aptitude (GA)
2 Qs

Most asked topics

Top topics across the included previous year papers.

General Aptitude
2 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Work and Time
2 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Chemical Engineering (CH) 2022
1 Qs
Chemical Engineering (CH) 2017
1 Qs

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Chemical Engineering (CH) 202220221View paper
Chemical Engineering (CH) 201720171View paper

All Work and Time previous year questions

Practice every matching question in batches of 20, with every available option.

1
2017 · General Aptitude (GA) · General Aptitude · Work and Time
Chemical Engineering (CH) 2017
Two machines M1 and M2 are able to execute any of four jobs P, Q, R and S. The machines can perform one job on one object at a time. Jobs P, Q, R and S take 30 minutes, 20 minutes, 60 minutes and 15 minutes each respectively. There are 10 objects each requiring exactly 1 job. Job P is to be performed on 2 objects, Job Q on 3 objects, Job R on 1 object and Job S on 4 objects. What is the minimum time needed to complete all the jobs?
Open complete paper
2
2022 · General Aptitude (GA) · General Aptitude · Work and Time
Chemical Engineering (CH) 2022
Pipes P and Q can fill a storage tank in full with water in 10 and 6 minutes, respectively. Pipe R draws the water out from the storage tank at a rate of 34 litres per minute. P, Q and R operate at a constant rate.
If it takes one hour to completely empty a full storage tank with all the pipes operating simultaneously, what is the capacity of the storage tank (in litres)?
Open complete paper