Numerical Computation and Estimation - General Aptitude - General Aptitude (GA) Previous Year Questions

Practice Numerical Computation and Estimation - General Aptitude - General Aptitude (GA) previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

10Papers
10Years
37Questions
1Topics

Numerical Computation and Estimation question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Numerical Computation and Estimation. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Easy 27 73%
Medium 10 27%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 25 67.6%
Numerical Answer Type (NAT) 12 32.4%

Subject weightage

Top subjects by unique question coverage.

General Aptitude (GA)
37 Qs

Most asked topics

Top topics across the included previous year papers.

General Aptitude
37 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Numerical Computation and Estimation
37 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Architecture and Planning (AR) 2025
3 Qs
Architecture and Planning (AR) 2023
2 Qs
Architecture and Planning (AR) 2022
2 Qs
Architecture and Planning (AR) 2021
1 Qs
Architecture and Planning (AR) 2020
2 Qs
Architecture and Planning (AR) 2018
1 Qs
Architecture and Planning (AR) 2016
2 Qs
Architecture and Planning (AR) 2015
10 Qs
Architecture and Planning (AR) 2014
1 Qs
Architecture and Planning (AR) 2012
13 Qs

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Architecture and Planning (AR) 202520253View paper
Architecture and Planning (AR) 202320232View paper
Architecture and Planning (AR) 202220222View paper
Architecture and Planning (AR) 202120211View paper
Architecture and Planning (AR) 202020202View paper
Architecture and Planning (AR) 201820181View paper
Architecture and Planning (AR) 201620162View paper
Architecture and Planning (AR) 2015201510View paper
Architecture and Planning (AR) 201420141View paper
Architecture and Planning (AR) 2012201213View paper

All Numerical Computation and Estimation previous year questions

Practice every matching question in batches of 20, with every available option.

1
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012

The least important measure for reducing cost of site development is

Open complete paper
2
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012

The best location for laying the main sewer line on a flat land is

Open complete paper
3
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012

Load from a slab to beam is primarily transferred through

Open complete paper
4
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012
A painting in a living room needs to be lighted at 250 lux. If the light is incident normally on the painting from a distance of 6 m, then the intensity of light source required (in candela) is
Open complete paper
5
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012

A 6m long beam is fixed at its left end and is free at its right end. If a concentrated load of 25kN acts downwards at 4m from the left end, then the bending moment (in kNm) at the left end is

Open complete paper
6
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012
A classroom of 12m x 25m x 4m requires 3 air changes per hour. At an air velocity of 2 m/s, the necessary duct cross section (in m²) is
Open complete paper
7
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012
If the original cost of a building is Rs. 25,00,000/- and its scrap value after 55 years is Rs.25,000/-, then its annual depreciation (in Rs.) using straight line method is
Open complete paper
8
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012

The area covered on ground (in hectare) by each photo format of 18 cm x 18 cm is

Open complete paper
9
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012
Quantity of water used (in kg) is
Open complete paper
10
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012

The area of 200 mm thick slab (in sq. m) that can be cast using the entire 10 ton of concrete will be

Open complete paper
11
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012
The R-value of the given wall section (in m2 degC/W) is
Open complete paper
12
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012
The brick wall has an overall dimension of 6m x 3m with a 1m x 2m window assembly (U-value = 2.5 W/m2 degC) and a 1m x 2.1m door assembly (U-value = 1.25 W/m2 degC). The overall U-value of the wall (Uo) (in W/m2 degC) is
Open complete paper
13
2012 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2012
Let f(x) = x – [x], where x ≥ 0 and [x] is the greatest integer not larger than x. Then f(x) is a
Open complete paper
14
2014 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2014
A factory has a fixed daily cost of Rs 50,000 whenever it operates and a variable cost of Rs 800Q, where Q is the daily production in tonnes. What is the cost of production in Rs per tonne for a daily production of 100 tonnes?
Open complete paper
15
2015 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2015
Operators \( \square, \diamond \) and \( \rightarrow \) are defined by: \( a \square b = \frac{a-b}{a+b} \), \( a \diamond b = \frac{a+b}{a-b} \), \( a \rightarrow b = ab \).
Find the value of \( (66 \square 6) \rightarrow (66 \diamond 6) \).
Open complete paper
16
2015 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2015
Bulking of sand is highest in
Open complete paper
17
2015 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2015
As per Fire Safety norms of NBC India for buildings having assembly and institutional occupancies, the maximum travel distance in meters to an exit from the dead end of a corridor is
Open complete paper
18
2015 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2015
A rectangular beam section of size 300 mm (width) X 500 mm (depth) is loaded with a shear force of 600 kN. The maximum shear stress on the section in N/mm² is ______
Open complete paper
19
2015 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2015
In a 50 meter section of a waste water pipe, if the gradient is 1 in 80, then the fall in millimeter is __________
Open complete paper
20
2015 · General Aptitude (GA) · General Aptitude · Numerical Computation and Estimation
Architecture and Planning (AR) 2015
A 15 meter long and 3 meter wide driveway needs to be paved with 300 mm X 300 mm square tiles. If each packet contains 30 numbers of tiles, then the number of packets to be procured to pave the whole area is __________
Open complete paper

Showing 20 of 37 questions