Difficulty distribution
How the classified questions are distributed by difficulty.
Your cart is empty.
Practice Land Management and Development Regulations - Planning Policy and Practice - Architecture and Planning previous year questions organised from real papers, with year-wise coverage and clear topic navigation.
Every graph below is calculated only from this selection.
Year-wise coverage for Land Management and Development Regulations. Each bar uses a separate theme-derived color.
How the classified questions are distributed by difficulty.
MCQ, numerical, multiple-select and other formats found in these papers.
Top subjects by unique question coverage.
Top topics across the included previous year papers.
Top subtopics inside this exact selection.
Question coverage for the most populated papers. Every active PYP paper remains listed below.
Newest papers appear first. Sort by year, question coverage or name.
| Paper | Year / session | Questions in this view | Open |
|---|---|---|---|
| Architecture and Planning (AR) 2013 | 2013 | 2 | View paper |
| Architecture and Planning (AR) 2011 | 2011 | 3 | View paper |
| Architecture and Planning (AR) 2010 | 2010 | 4 | View paper |
| Architecture and Planning (AR) 2009 | 2009 | 2 | View paper |
| Architecture and Planning (AR) 2008 | 2008 | 1 | View paper |
| Architecture and Planning (AR) 2007 | 2007 | 2 | View paper |
Practice every matching question in batches of 20, with every available option.
As per revised building bye-laws, if the required setbacks are – Front 3 metres, each Side 2 metres and Rear 2 metres, then the maximum total buildable area will
The instrument that provides standards for land development by indicating lot sizes and layouts is
A commercial plot measures 100 m × 80 m. If the permissible Floor Space Index (FSI) is 3.0, and 50% of the ground is covered, then the maximum number of floors that can be built is
Assuming 20% of the total population being higher secondary school going children and expected enrolment being 80% with per capita floor space requirement of 5.0 sqm, then minimum land required for school building with 40% ground coverage and FAR 0.5 would be
The information that is NOT essential to be submitted for sanction of any building plan is