My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Construction Methods and Building Components - Building Construction, Materials, and Structural Systems - Architecture and Planning Previous Year Questions

Practice Construction Methods and Building Components - Building Construction, Materials, and Structural Systems - Architecture and Planning previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

7Papers
7Years
38Questions
1Topics

Construction Methods and Building Components question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Construction Methods and Building Components. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Easy 26 68.4%
Medium 11 28.9%
Hard 1 2.6%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 34 89.5%
Fill in the blanks 3 7.9%
Numerical Answer Type (NAT) 1 2.6%

Subject weightage

Top subjects by unique question coverage.

Architecture and Planning
38 Qs

Most asked topics

Top topics across the included previous year papers.

Building Construction, Materials, and Structural Systems
38 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Construction Methods and Building Components
38 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Architecture and Planning (AR) 2022
1 Qs
Architecture and Planning (AR) 2013
7 Qs
Architecture and Planning (AR) 2011
7 Qs
Architecture and Planning (AR) 2010
4 Qs
Architecture and Planning (AR) 2009
6 Qs
Architecture and Planning (AR) 2008
4 Qs
Architecture and Planning (AR) 2007
9 Qs

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Architecture and Planning (AR) 202220221View paper
Architecture and Planning (AR) 201320137View paper
Architecture and Planning (AR) 201120117View paper
Architecture and Planning (AR) 201020104View paper
Architecture and Planning (AR) 200920096View paper
Architecture and Planning (AR) 200820084View paper
Architecture and Planning (AR) 200720079View paper

All Construction Methods and Building Components previous year questions

Practice every matching question in batches of 20, with every available option.

1
2007 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2007

A brick cut lengthwise into two pieces so that each piece is half as wide as the full brick is called a

Open complete paper
2
2007 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2007
Match the labels on a panelled door in Group I with their names in Group II.

Group I
P (label on top rail)
Q (label on stile)
R (label on muntin)
S (label on panel)
T (label on bottom rail)

Group II
1. Jamb
2. Muntin
3. Panel
4. Rail
5. Saddle
6. Stile

Question diagram

Open complete paper
3
2007 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2007
A single room of 3 metres x 5 metres enclosed by 20 cm thick walls has to be constructed. The required foundation trench is 80 cm wide and 80 cm deep. The quantity of earthwork in excavation in cubic metres is
Open complete paper
4
2007 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2007
The quantity of plastering in sq.m required for both sides of a wall 5.0 m x 0.30 m x 3.0 m (L x B x H) with a window opening 2.0 m x 0.30 m x 1.2 m is
Open complete paper
5
2007 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2007
Match the window types in Group I with their descriptions in Group II.

Group I
P. Bay window
Q. Pivoted window
R. Dormer window

Group II
1. Horizontal louvers pivoting simultaneously in a common frame
2. A sash that rotates 90° or 180° about a vertical or horizontal axis at or near its centre
3. Projecting outward from the main wall of a building, forming an alcove within a room
4. Vertical window projecting out of a sloping roof
Open complete paper
6
2007 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2007
Tactile flooring with guiding blocks, an element of Barrier Free Design, is used to aid P. ambulant disabled, Q. non-ambulant disabled, R. partially sighted, S. totally blind
Open complete paper
7
2007 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2007
Match the characteristics of vaults in Group I with their names in Group II. Group I: P. Uniform semi-circular cross section, Q. Semi-circular cross section larger at one end than the other, R. Compound vault formed by perpendicular intersection of two vaults, S. Compound vault formed by four coves meeting along diagonal vertical planes. Group II: 1. Barrel, 2. Cloister, 3. Conical, 4. Groin, 5. Rampant, 6. Stilted
Open complete paper
8
2007 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2007

A 60° segmental arch is provided over a door of 1.0 m width. The wall thickness is 30 cm and the arch thickness is 20 cm. The mean length of the arch in metres is

Open complete paper
9
2007 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2007
Maximum total buildable area in sq.m is
Open complete paper
10
2008 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2008

Organizations namely STACO, UNSCC and ISO are associated with:

Open complete paper
11
2008 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2008
Match the equipments with their use.

Question diagram

Open complete paper
12
2008 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2008

A squinch system is a method of constructing an arch across a square base by erecting

Open complete paper
13
2008 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2008
Match the appropriate arches with types listed below.

Question diagram

Open complete paper
14
2009 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2009

The minimum thickness of a wall where single Flemish bond can be used is

Open complete paper
15
2009 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2009
Match the figures of cut bricks in Group I with their terms in Group II:
Group IGroup II
P1. King Closer
Q2. Queen Closer
R3. Half Bat
S4. Three Quarter Bat

Question diagram

Open complete paper
16
2009 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2009

A site has 6 contour lines and the length of the line joining the midpoints of the highest contour and lowest contour is 300 m. If the slope of the line is 1 in 10, then the contour interval (in m) is

Open complete paper
17
2009 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2009
Match the notations in the given figure in Group I with corresponding names in Group II: Group I P, Q, R, S, T (diagram) Group II 1. Intrados 2. Extrados 3. Archivolt 4. Spring 5. Rise 6. Keystone

Question diagram

Open complete paper
18
2009 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2009
The quantity of stone work in the semi-circular arch (in cu.m) is
Open complete paper
19
2009 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2009

The quantity of brickwork in the wall (in cu.m) is

Open complete paper
20
2010 · Architecture and Planning · Building Construction, Materials, and Structural Systems · Construction Methods and Building Components
Architecture and Planning (AR) 2010

A flat arch at the skewback should NOT have an angle less than