My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Previous year question hub

Work and Time - General Aptitude - General Aptitude (GA) Previous Year Questions

Practice Work and Time - General Aptitude - General Aptitude (GA) previous year questions organised from real papers, with year-wise coverage and clear topic navigation.

7Papers
7Years
9Questions
1Topics

Work and Time question pattern

Every graph below is calculated only from this selection.

Questions by year

Year-wise coverage for Work and Time. Each bar uses a separate theme-derived color.

Difficulty distribution

How the classified questions are distributed by difficulty.

Easy 7 77.8%
Hard 2 22.2%

Question type distribution

MCQ, numerical, multiple-select and other formats found in these papers.

MCQ 6 66.7%
Numerical Answer Type (NAT) 3 33.3%

Subject weightage

Top subjects by unique question coverage.

General Aptitude (GA)
9 Qs

Most asked topics

Top topics across the included previous year papers.

General Aptitude
9 Qs

Subtopic coverage

Top subtopics inside this exact selection.

Work and Time
9 Qs

Paper coverage

Question coverage for the most populated papers. Every active PYP paper remains listed below.

Aerospace Engineering (AE) 2022
2 Qs
Aerospace Engineering (AE) 2019
1 Qs
Aerospace Engineering (AE) 2018
1 Qs
Aerospace Engineering (AE) 2017
1 Qs
Aerospace Engineering (AE) 2015
2 Qs
Aerospace Engineering (AE) 2014
1 Qs
Aerospace Engineering (AE) 2010
1 Qs

Included previous year papers

Newest papers appear first. Sort by year, question coverage or name.

PaperYear / sessionQuestions in this viewOpen
Aerospace Engineering (AE) 202220222View paper
Aerospace Engineering (AE) 201920191View paper
Aerospace Engineering (AE) 201820181View paper
Aerospace Engineering (AE) 201720171View paper
Aerospace Engineering (AE) 201520152View paper
Aerospace Engineering (AE) 201420141View paper
Aerospace Engineering (AE) 201020101View paper

All Work and Time previous year questions

Practice every matching question in batches of 20, with every available option.

1
2010 · General Aptitude (GA) · General Aptitude · Work and Time
Aerospace Engineering (AE) 2010

5 skilled workers can build a wall in 20 days; 8 semi-skilled workers can build a wall in 25 days; 10 unskilled workers can build a wall in 30 days. If a team has 2 skilled, 6 semi-skilled and 5 unskilled workers, how long will it take to build the wall?

Open complete paper
2
2014 · General Aptitude (GA) · General Aptitude · Work and Time
Aerospace Engineering (AE) 2014
A factory has a fixed daily cost of Rs 50,000 whenever it operates and a variable cost of Rs 800Q, where Q is the daily production in tonnes. What is the cost of production in Rs per tonne for a daily production of 100 tonnes?
Open complete paper
3
2015 · General Aptitude (GA) · General Aptitude · Work and Time
Aerospace Engineering (AE) 2015
A rocket engine produces a total impulse of 112 kN.s in a burn time period of 3.5 minutes with a propellant mass flow rate of 0.25 kg/s. The effective exhaust velocity (in m/s) of gas ejecting from the engine is ______.
Open complete paper
4
2015 · General Aptitude (GA) · General Aptitude · Work and Time
Aerospace Engineering (AE) 2015
An aircraft in level and unaccelerated flight with a velocity of \( v_{\infty} = 300 \ m/s \) requires a power of \( 9 \times 10^6 \ W \). If the aircraft weighs \( 1.5 \times 10^5 \ N \), the lift-to-drag ratio \( \frac{L}{D} \) is ______.
Open complete paper
5
2017 · General Aptitude (GA) · General Aptitude · Work and Time
Aerospace Engineering (AE) 2017

1200 men and 500 women can build a bridge in 2 weeks. 900 men and 250 women will take 3 weeks to build the same bridge. How many men will be needed to build the bridge in one week?

Open complete paper
6
2018 · General Aptitude (GA) · General Aptitude · Work and Time
Aerospace Engineering (AE) 2018

A contract is to be completed in 52 days and 125 identical robots were employed, each operational for 7 hours a day. After 39 days, five-seventh of the work was completed. How many additional robots would be required to complete the work on time, if each robot is now operational for 8 hours a day?

Open complete paper
7
2019 · General Aptitude (GA) · General Aptitude · Work and Time
Aerospace Engineering (AE) 2019
Two trains started at 7AM from the same point. The first train travelled north at a speed of 80km/h and the second train travelled south at a speed of 100 km/h. The time at which they were 540 km apart is _______ AM.
Open complete paper
8
2022 · General Aptitude (GA) · General Aptitude · Work and Time
Aerospace Engineering (AE) 2022
For the past m days, the average daily production at a company was 100 units per day.

If today’s production of 180 units changes the average to 110 units per day, what is the value of m?
Open complete paper
9
2022 · General Aptitude (GA) · General Aptitude · Work and Time
Aerospace Engineering (AE) 2022
Four cities P, Q, R and S are connected through one-way routes as shown in the figure. The travel time between any two connected cities is one hour. The boxes beside each city name describe the starting time of first train of the day and their frequency of operation. For example, from city P, the first trains of the day start at 8 AM with a frequency of 90 minutes to each of R and S. A person does not spend additional time at any city other than the waiting time for the next connecting train.
If the person starts from R at 7 AM and is required to visit S and return to R, what is the minimum time required?

Question diagram

Open complete paper