My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Exam Details

SSC JE Civil Engineering (CE) SET 7 (TECHNICAL) 2016

Review the key details, then start the test when you are ready. You can also open the full package to see related papers.

Questions 100
Duration 180 mins
Package AE & JE Exams - Previous Year Papers

Paper pattern & analysis

Filter this paper by subject, topic or subtopic. Every graph updates from the selected questions.

Explore previous papers
Showing all 100 questions in this paper.

Subject distribution

No subject classification is available.

Topic distribution

No topic classification is available.

Subtopic distribution

No subtopic classification is available.

Difficulty distribution

Easy 49 49%
Medium 47 47%
Hard 4 4%

Question type distribution

Multiple Choices 100 100%

Instructions

Demo Instruction

Syllabus

Sample

Sample questions from this paper

Questions are selected across the paper subjects wherever the paper contains that variety.

1
2016 · Unclassified
SSC JE Civil Engineering (CE) SET 7 (TECHNICAL) 2016
Plaster of Paris is obtained by calcining _____.
A
bauxite
B
gypsum
C
lime stone
D
kankar
2
2016 · Unclassified
SSC JE Civil Engineering (CE) SET 7 (TECHNICAL) 2016
For the manufacture of Portland cement the proportions of raw material used are _______.
A
lime 63%; silica 22%; other ingredients 15%
B
silica 40%; lime 40%; other ingredients 40%
C
silica 70%; lime 20%; other ingredients 20%
D
silica 63%; lime 22%; other ingredients 15%
3
2016 · Unclassified
SSC JE Civil Engineering (CE) SET 7 (TECHNICAL) 2016
To retard the initial setting time of cement, the compound responsible is ______.
A
Tri-calcium silicate
B
Gypsum
C
Tri calcium aluminate
D
Di-calcium silicate
4
2016 · Unclassified
SSC JE Civil Engineering (CE) SET 7 (TECHNICAL) 2016
Quick setting cement is produced by adding ______.
A
less amount of gypsum in very fine powdered form
B
more amount of gypsum in very fine powdered form
C
aluminium sulphate in very fine powdered form
D
pozzolana in very fine powdered form
5
2016 · Unclassified
SSC JE Civil Engineering (CE) SET 7 (TECHNICAL) 2016
If P is the percentage of water required for normal consistency, water to be added for determination of initial setting time is ________.
A
0.70 P
B
0.75 P
C
0.78 P
D
0.85 P
6
2016 · Unclassified
SSC JE Civil Engineering (CE) SET 7 (TECHNICAL) 2016
Pick up the correct statement from the following..
A
Adding 5% to 6% moisture content by weight, increases the volume of dry sand from 18% to 38%
B
The bulking of fine sand is more than that of coarse sand
C
If the percentage content of moisture exceeds 10%, increase in bulk of sand starts decreasing
D
all options are correct