Exam Details
ISRO Electrical Engineering 2017
Review the key details, then start the test when you are ready. You can also open the full package to see related papers.
Questions
80
Duration
180 mins
Package
ESE & GATE EE - Previous Year Papers
Paper pattern & analysis
Filter this paper by subject, topic or subtopic. Every graph updates from the selected questions.
Topic distribution
Subtopic distribution
Difficulty distribution
80questions
Medium
43
53.8%
Easy
31
38.8%
Hard
6
7.5%
Question type distribution
80questions
Multiple Choices
80
100%
Instructions
Demo Instruction
Syllabus
Sample
Sample questions from this paper
Questions are selected across the paper subjects wherever the paper contains that variety.
2017 · Unclassified
ISRO Electrical Engineering 2017
The starting torque of a three phase induction motor can be increased by
2017 · Unclassified
ISRO Electrical Engineering 2017
The capacitor start-capacitor run single phase induction motor is operationally a
2017 · Unclassified
ISRO Electrical Engineering 2017
What would happen if the field of a D.C . shunt motor is opened?
2017 · Unclassified
ISRO Electrical Engineering 2017
Equaliser rings in D.C. generator with lap windings are used for
2017 · Unclassified
ISRO Electrical Engineering 2017
The Buchholz relay is normally used to protect the
2017 · Unclassified
ISRO Electrical Engineering 2017
A 400/200 volts transformer has pu impedance of 0.05. The HV side voltage required to circulate full load current during short circuit test is