My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Exam Details

Electrical Engineering SET 2 2016

Review the key details, then start the test when you are ready. You can also open the full package to see related papers.

Questions 65
Duration 180 mins
Package ESE & GATE EE - Previous Year Papers

Paper pattern & analysis

Filter this paper by subject, topic or subtopic. Every graph updates from the selected questions.

Explore previous papers
Showing all 65 questions in this paper.

Subject distribution

No subject classification is available.

Topic distribution

No topic classification is available.

Subtopic distribution

No subtopic classification is available.

Difficulty distribution

Medium 41 63.1%
Hard 20 30.8%
Easy 4 6.2%

Question type distribution

Multiple Choices 38 58.5%
Fill in the blanks 27 41.5%

Instructions

Demo Instruction

Syllabus

Sample

Sample questions from this paper

Questions are selected across the paper subjects wherever the paper contains that variety.

1
2016 · Unclassified
Electrical Engineering SET 2 2016
The chairman requested the aggrieved shareholder to_________him.
A
bare with
B
bore with
C
bear with
D
bare
2
2016 · Unclassified
Electrical Engineering SET 2 2016
Identify the correct spelling out of the given options:
A
Managable
B
Manageable
C
Managible
D
Manageble
3
2016 · Unclassified
Electrical Engineering SET 2 2016
Pick the odd one out in the following 13, 23, 33, 43, 53
A
23
B
33
C
53
D
43
4
2016 · Unclassified
Electrical Engineering SET 2 2016
R2D2 is a robot. R2D2 can repair aeroplanes. No other robot can repair aeroplanes. Which of the following can be logically inferred from the above statements?
A
R2D2 is a robot which can only repair aeroplanes.
B
R2D2 is the only robot which can repair aeroplanes.
C
Only R2D2 is a robot.
D
R2D2 is a robot which can repair only aeroplanes.
5
2016 · Unclassified
Electrical Engineering SET 2 2016
If then is _______.
A
0
B
+/3
C
-0.333333333
D
undefined
6
2016 · Unclassified
Electrical Engineering SET 2 2016
The following graph represents the installed capacity for cement production (in tonnes) and the actual production (in tonnes) of nine cement plants of a cement company. Capacity utilization of a plant is defined as ratio of actual production of cement to installed capacity. A plant with installed capacity of at least 200 tonnes is called a large plant and a plant with lesser capacity is called a small plant. The difference between total production of large plants and small plants, in tonnes, is ________.
A
130
B
120
C
140
D
110