Exam Details
Civil Engineering (CE) 2005
Review the key details, then start the test when you are ready. You can also open the full package to see related papers.
Questions
90
Duration
180 mins
Package
ESE & GATE CE - Previous Year Papers
Paper pattern & analysis
Filter this paper by subject, topic or subtopic. Every graph updates from the selected questions.
Topic distribution
Subtopic distribution
Difficulty distribution
90questions
Medium
70
77.8%
Hard
13
14.4%
Easy
7
7.8%
Question type distribution
90questions
Multiple Choices
90
100%
Instructions
Demo Instruction
Syllabus
Sample
Sample questions from this paper
Questions are selected across the paper subjects wherever the paper contains that variety.
2005 · Unclassified
Civil Engineering (CE) 2005
Consider the matrices X(4, 3), Y(4, 3) and P(2, 3). The order of will be


2005 · Unclassified
Civil Engineering (CE) 2005
Consider a non-homogeneous system of linear equations representing mathematically an over-determined system. Such a system will be
2005 · Unclassified
Civil Engineering (CE) 2005
Which of the following is NOT true for complex number Z1 and Z2?
2005 · Unclassified
Civil Engineering (CE) 2005
Which one of the following statement is NOT true?
2005 · Unclassified
Civil Engineering (CE) 2005
IS: 1343 - 1980 limits the minimum characteristic strength of pre-stressed concrete for post tensioned works and pretension work as
2005 · Unclassified
Civil Engineering (CE) 2005
The permissible stress in axial tension s„ in steel member on the net effective area of the section shall not exceed the following value (fy is the yield stress)