My Cart
Your Cart 0

    Your cart is empty.

  • Total (Amount) ₹0.00
Exam Details

2021 Civil Engineering

Review the key details, then start the test when you are ready. You can also open the full package to see related papers.

Questions 150
Duration 180 mins
Package Indian Economic Service and Indian Statistical Service Examination - Previous Year Papers

Paper pattern & analysis

Filter this paper by subject, topic or subtopic. Every graph updates from the selected questions.

Explore previous papers
Showing all 150 questions in this paper.

Subject distribution

No subject classification is available.

Topic distribution

No topic classification is available.

Subtopic distribution

No subtopic classification is available.

Difficulty distribution

Medium 50 33.3%
Hard 50 33.3%
Easy 50 33.3%

Question type distribution

Multiple Choices 150 100%

Syllabus

Full Syllabus

Sample questions from this paper

Questions are selected across the paper subjects wherever the paper contains that variety.

1
2021 · Unclassified
2021 Civil Engineering
When the deposit of efflorescence is more than 10% but less than 50% of the exposed area of the brick, the presence of efflorescence is
A
Moderate
B
Slight
C
Heavy
D
Serious
2
2021 · Unclassified
2021 Civil Engineering
Mohs scale is used for stones to determine
A
Flakiness index
B
Durability
C
Strength
D
Hardness
3
2021 · Unclassified
2021 Civil Engineering
Which of the following conditions are recommended for using sulphate resisting cement? 1. Concrete to be used in foundation and basement, where soil is not infested with sulphates 2. Concrete used for fabrication of pipes which are likely to be buried in marshy region or sulphate bearing soils 3. Concrete to be used in the construction of sewage treatment works
A
2 and 3 only
B
1 and 2 only
C
1 and 3 only
D
1, 2 and 3
4
2021 · Unclassified
2021 Civil Engineering
Which one of the following cements is a deliquescent?
A
Quick setting Portland cement
B
White and Coloured cement
C
Calcium Chloride cement
D
Water Repellent cement
5
2021 · Unclassified
2021 Civil Engineering
Consider the following data for concrete with mild exposure: Water-cement ratio = 0.50 Water = 191.6 litre The required cement content will be
A
561 kg/m3
B
472 kg/m3
C
383 kg/m3
D
294 kg/m3
6
2021 · Unclassified
2021 Civil Engineering
The strength of a fully matured concrete sample is 500 kg/cm2. When cured at an average temperature of 20°C in day, 10°C in night, datum temperature T0 is -11°C. If Plowman constants A is 32 and B is 54, the strength of identical concrete at 7 days will be nearly
A
333 kg/cm2
B
312 kg/cm2
C
272 kg/cm2
D
243 kg/cm2